Сохранить в закладки 1600093512123:
Sew gearmotor pipe industrial electric motorized rail transfer car, it makes the AC electricity power is transformed into AC 36v two-phase and are respectively connected to the two rails. Then the rail transfer car conduct the AC 36v on rail into the electrical appliance box at the bottom of the rail transfer car. And then the AC 36v is transformed into DC 36v and then control the DC motor through the DC control system to make the rail transfer car start, stop, go forward and backward and adjust the speed and so on.
Items | Description |
Size | 3670*2100*2500mm |
Weight | Empty 1800kg/Full 2300kg |
Motor | LIM motor |
Power | AC48v/75v/90v |
Speed | Max 10km/h |
No matter how big,how small,how luxury,how econmic,adults or kids,indoor or outdoor amusement park you want to build,our professional team can supply one perfect plan for you within 24hours.
Zhengzhou Shenlong Amusement is professional on amusement park design,ourengineers will do a park design according to the park area and national custom,we have finished many satisfactory parks all over the world.
Zhengzhou Shenlong Animation and Amusement Equipment Co., Ltd. is a professional manufacturer, which has been leading the pack on process scale, technical level, research and development ability in China. As a member of China's Associate of Amusement Park, we own a series of world-ranking production equipment and advanced detecting facilities. We are located in western industrial park in Zhengzhou, which is one of the biggest land and air transport hubs in China. With USD15 million fixed assets, Shenlong covers a total area of 40,000 square meters. The building area is more than 10,000 square meters.We are specialized in1) pirate ship series.2)carousel/merry go around series: carousel,rotating bee3)mini roller caoster:sliding dragon,caterpillar,mad mouse.4)arabic flying carpet5)disco tadada,flying ufo,flying chairs6)electric train. elephant train, mini train Now we have more than 120 staff members, including 10 administrators, 6 senior engineers and 11 intermediate engineers. All of our workers have obtained relevant technical qualifications.
Q: Are you a trader or manufacturer?
A: We are both. We have our own factory and many trusted partner factories.
Q: Can I just order one set?
A: Of course, one set is ok.
Q: How to install our products?
A: we can provide detailed installation video/pictures, or send engineers team.
Q: What's your delivery time ?
A: It is based on order quantity. Normally, our production time is 10 to 20 working days.
Q: What is the shipping way?
A: We usually ship the goods by sea, and also accept other shipping way as required.
Q: What is your terms of payment ?
A: Our Payment term: 30% deposit by L/C,T/T Western Union or cash, and pay the balance before shipment.
Q: How can I place order ?
A: Inquiry- Send offer-Negotiation-Sign contract--Pay deposit- Production-Pay dep-osit-loading -delivery.
Новинки товаров от производителей по оптовым ценам