Хелатное удобрение, водорастворимое органическое удобрение EDTA Fe 13%, железная удобрение
2,30 $ - 13,00 $
Сохранить в закладки 1600114277246:
Product Description | ||||||||
Products | Name | Custom and Standard Rubber buffers for auto and machine | ||||||
Products category | rubber metal bonded parts | |||||||
Material | EPDM,NR,SBR,Nitrile, Silicone, Fluorosilicone, Neoprene, Urethane(PU), Polyacrylate(ACM), Ethylene Acrylic(AEM), HNBR, Butyl(IIR), plastic like material (TPE, PU, NBR, silicone, NBR+TPE etc) | |||||||
Size | All size and thickness available. | |||||||
Shape | capable of all shapes as per drawing | |||||||
Color | Natural,black, Pantone code or RAL code, or as per client's samples or requirements | |||||||
Hardness | 20°~90° Shore A, usually 30°~80° Shore A. | |||||||
Surface finishing | Texture (VDI/MT standard, or made to client's sample), polished (high polish, mirror polish), smooth, painting, powder coating, printing, electroplating etc. | |||||||
Drawing | 2D or 3D draiwng in any image/picture format is OK | |||||||
Free sample | Yes | |||||||
OEM/OEM | Yes | |||||||
Application | Household, electronics, for vehicles like GM, Ford, Renault, Honda. Machinery, hospital, petrochemical, Military and Aerospace etc. | |||||||
Market | Europe, North America, Oceania | |||||||
Quality certification | ISO 90001:2008, TS16949,REACH, ROHS, SGS | |||||||
QC | Every order production will get more than 10 times regular check and 5 fives times random check by our professional QC. Or by Third party appointed by customer | |||||||
Mold | Molding Process | Injection molding, mold processing, extrusion | ||||||
Mould type | processing mold, injection mold, extrusionmold | |||||||
Machines | 350T vacuum pressing machine and other pressing machine at 300T,250T and so on | |||||||
Tooling equipment | Rubber tension tester, Rubber vulcanization instrument, Durometer, calipers, ageing oven | |||||||
Cavity | 1~400 cavities | |||||||
Mould Life | 300,000~1,00,000 times | |||||||
Production | Production capacity | finish each mold of product in 3 minutes and working on 3 shifts within 24 hours | ||||||
Mold lead time | 15~35 days | |||||||
Sample lead time | 3~5 days | |||||||
Production time | usually 15~30 days, should be confirmed before order | |||||||
Loading port | Qingdao,Hangzhou, Shanghai, Ningbo or as required |
Новинки товаров от производителей по оптовым ценам