Туннель основные инженерные буровой платформы для бурения буровых скважин

Сохранить в закладки 1600247876626:


Цена:5 000,00 $*

Количество:

  • В избранное

Описание и отзывы

Характеристики


_07.jpg








 

 


 


KDZ-300 Tunnel Core Engineering Drilling Rig Machine EB2991


 


Product Description:


KDZ-300 tunnel rig is a mechanical vertical shaft engineering core (integrated tower crane) tunnel rig. It is suitable for underground ventilation, gas extraction and drainage holes, water prevention engineering, engineering geological drilling, conventional rope core drilling, coal mine Water exploration, hydropower engineering drilling, dam foundation grouting and drilling, geological survey and blasting drilling, etc.


Main Feature:
1. The transfer case, gearbox and clutch of mature GXY-2 and hydraulic chuck of XY-44A are used. The parts have good versatility.


2. Adopt three-chuck clamping system. The upper chuck with automatic shackle can avoid damaging the drill pipe thread when the rig is unloading; the main chuck rotates stably and reliably; drilling upwards, the lower chuck plays a protective role to prevent the drill pipe in the hole from slipping.


3. The torque of 4000Nm ensures the implementation of large-diameter (through-hole diameter Φ93mm) and long-distance drilling process. Because the rig is mechanically rotating, the energy of impact start is large, so it has a very good performance when there are accidents in holes such as submerged drills and hold drills.


4. The rig has more (8-speed) speed stages and a reasonable speed range. It is suitable for both engineering geological survey and diamond core drilling. It also has two speeds of reversing speed, which is not labor-intensive and safe when dealing with accidents in holes.


5. Built-in lifting and rotating device, after a single lifting of the whole machine, it can rotate from 0 to 360 °, and the whole machine can realize three-dimensional drilling at any angle.


6. The 4 hydraulic props randomly arranged can realize all-round angle adjustment, and realize safe and fast fixing of the rig.


7. In addition to S59, S75, S95, BQ, NQ, and HQ rope drill rigs, rigs are also suitable for Φ50 and Φ60 ordinary wire drill rods.
8. The drilling rig also has a step-by-step walking device, which can move in all directions in conjunction with the lifting and lowering of the rotary oil cylinder, which greatly reduces the labor force.
9. Equipped with tower crane integrated drilling tower (optional for users), users can adjust it according to the size of the underground tunnel, each section is 0.5 meters, and it can also be removed and not used.
10. Compared with the full hydraulic drilling rig, the KDZ-300 tunnel rig has higher transmission efficiency, more convenient maintenance, more affordable price, low use cost and low labor intensity. It is an energy-efficient and economical tunnel rig.
Technical Parameters: 


 




































































































































Drilling Capacity



Drill Rod Specifications



Φ50;Φ60;S59;S75;S95;BQ;NQ;HQ Drill Rod



Drilling Depth



300-600m



Basic Parameters



Drilling Inclination



0~360°



Rig Dimensions (L × W × H)



2415×1800×2285mm



Rig Weight (Including Power)



2800Kg



Vertical Shaft Through Hole Diameter



Φ93mm



Gyroscope



Vertical Shaft Speed (Power Machine Speed 1470r / min)



Forward Speed



56;93;154;212;264;458;723;998r/min



Reverse Speed



44;207r/min



Vertical Shaft Torque



4000N·m



Vertical Axis Stroke



500mm



Maximum Vertical Axis Pressure



120KN



Lifting Force of Vertical Shaft



90KN



Maximum Clamping Force of Three Chucks (Upper Chuck, Main Chuck, Lower Chuck)



All are 13t



Ranch



Are 13 tons



Hoist



Maximum Lifting Capacity (Low Speed Single Rope)



30KN



Drum Speed



37;65;103;141r/min



Wire Rope Lifting Speed (Single Rope)



0.41;0.73;1.15;1.58m/s



Wire Rope Diameter



Φ16mm



Rope Capacity



40m



Hydraulic System



Oil Pump Rated Pressure, Rated Displacement



Double Gear Oil Pump 20MPa,25/10ml/r



Main Hydraulic Operating System Pressure



8MPa



Vice Hydraulic Operating System Pressure



8MPa



Vice Hydraulic Operating System Pressure



2MPa



Frame



Rig Back Stroke



350mm



Distance From The Rig to the Hole



200mm



Power Configuration



Motor Y200L-4



30KW,1470r/min



Drilling Tower (Optional for Users)



Tower Height (Total Height)



3.7m;4.2m;4.7m (0.5m Per Section, User Optional)



Other Parameters



Propulsion Cylinder Stroke Under the Gyrator



300mm



Four Leg Cylinder Travel



600mm



KDZ-300-1.jpgKDZ-300-2.jpgKDZ-300-2-1.jpgKDZ-300-2-2.jpgKDZ-300-2-3.jpg


_01.jpg


_02.jpg_03.jpg_04.jpg_05.jpg_06.jpg


 


Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам