Вакуумное литье под заказ

Сохранить в закладки 1600361263445:


Цена:*

Количество:

  • В избранное

Описание и отзывы

Характеристики











Products Description


Name
Casting parts service
Material
Aluminum:ADC12,ADC10,A360,A356,A380,A413,B390,EN47100,EN44100 or customized .
Zinc: ZA3#, ZA5#, ZA8# or customized .
Copper, Stainless steel.
Film Standard
Powder coating: 60-120 μ , Electrophoresis film: 12-25 μ.
Casting tolerance
+/-0.002~+/-0.005mm
Part Weight
from 3 g --- 20kgs
Thickness
0.4mm-20mm or Customized.
Surface Treatment
Mill-Finished, Powder Coating,Polishing, Brushing, etc.
Application
Industry fittings and Construction and Decoration.
Casting Machine
200-1200 tons
Capability
Output 100 tons per month.
Deep Processing
CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling
Film Standard
As custimer's . Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ.
Surface Roughness
Min Ra 0.4~6.3


Quality Control
1) Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2) Checking the details before the production line operated
3) Have full inspection and routing inspection during mass production---In process quality control(IPQC)
4) Checking the goods after they are finished---- Final quality control(FQC)
5) Checking the goods after they are finished-----Outgoing quality control(OQC)


We have a professional engineer team to design custom parts for your remand, we also have a lot of ready-made standard moulds that can save your cost and time . We offer ODM/OEM service, Production Design and Mould Design base on your requirement . Providing the sample before mass production , ensure all is OK for you .




Production Process




Our Factory




Packing & Shipping






Our Company






Customer Visit




Certificate






FAQ


Q1.What is the specific fabrication process ?
Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs→QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service
Q2.What's the production time for new molds and mass production?
7-10 days to make the new moulds, mass production takes around 20-25days,can process urgently if need
Q3.Can you send me samples ?
Yes, Samples are for free, and freight is on your side.
Q4.How long is the lifetime ?
Anodizing for 12-15 years outdoor, Powder coating for 18-20 years outdoor.
Q5.What is the payment terms ?
T/T: 30% deposit, the balance will be paid before delivery;
L/C: the balance irrevocable L/C at sight.


Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам