Дешево кольцо 3-х осевой LPG пропан-Бутане или Газе для диспенсер для хранения бак-натриевый вкладыш GCL
3 000,00 $ - 8 000,00 $
Сохранить в закладки 1600379127692:
General data | Tank body | |||||||||
Chassis model | -- | Medium | Liquefied Petroleum Gas | |||||||
Tractor model | -- | Filling medium | Propane of LPG | |||||||
Engine power KW | -- | Work temperature ℃ | -20~50 | |||||||
Kerb mass ㎏ | 14922 | Design temperature ℃ | -42~55 | |||||||
The maximum allowed filling weight kg | 25078 | Work pressure MPa | ≤1.61 | |||||||
Total mass ㎏ | 40000 | Design pressure MPa | 1.61 | |||||||
Distribution of axle load in full load | King pin ㎏ | 16300 | Corrosion allowance mm | 1.5 | ||||||
Rear axle ㎏ | 23700 | Joint efficiency | 1 | |||||||
Design speed limit Km/h | Straight road | 80 | Material | Shell | Q420R(Normalizing) | |||||
Turn | 20 | Head | Q420R(Normalizing) | |||||||
Front overhang/rear overhang mm | -/1650 | Capacity m³ | 61.9 | |||||||
Approach angle/departure angle° | -/20° | Filling weight per volume ㎏/m³ | 420 | |||||||
Maximum stable side-inclination in full load ° | ≥23° | Hydraulic horizontal test pressure MPa | 2.1 | |||||||
Overall dimension(L*W*H) mm | ~13590×2500×3990 | Air test pressure MPa | 1.61 | |||||||
Design working life Years | 10 | Thermally insulation thickness/material mm | -- | |||||||
Applicable mode of transportation | Road | Safety valve | ||||||||
Emergency valve | Type | A412F-25-22 | ||||||||
Type | Gas phase | QGJ43F-25-8 | Form | Interior and full lift | ||||||
Liquid phase | QGJ43F-25-7 | Norminal pressure MPa | 2.5 | |||||||
Specification | Gas phase | DN25 | Valve base size mm | 68 | ||||||
Liquid phase | DN50 | Self-pressure MPa | 1.73 | |||||||
Form | Emergency valve and excess flow cut off valve | Discharge-pressure MPa | ≤1.93 | |||||||
Operation mode | Manual | Return-pressure MPa | ≥1.56 | |||||||
Closed stop time | ≤5S | Diameter of rupture disk mm | -- | |||||||
Melt closed temperature ℃ | 75±5 | Burst pressure of rupture disk MPa | -- | |||||||
Level gauge | Handling device | |||||||||
Type | UQZ-25P | Type | Gas phase | YKAG-33-6 | ||||||
Form | Float | Liquid phase | YKAG-33-7 | |||||||
Nominal pressure MPa | 2.5 | Specification | Gas phase | DN25 | ||||||
Measurement range mm | 50~2478 | Liquid phase | DN50 | |||||||
Precision | 2.5 | Pattern | Quick tie-in | |||||||
Pressure gauge | YN-100T | Norminal pressure MPa | 3.3 | |||||||
Therm-ometer | WTQ-280 | Conducting electrostatic tape type | JD-2 | |||||||
Approvals | Supervision Regulations on Safety Technology for Transportable Pressure Vessel (TSG R0005-2011 ) | |||||||||
Design code | ASME sec viii div.2 edition 2017 | |||||||||
Product standard | The design/fabrication/testing and inspection, and acceptance of the tank must fully comply with GB/T19905-2005"Liquefied gas tanker". | |||||||||
Painting | Shot blast at Standard SA 2.5 prior to application of anti-corrosion primer, polyurethane top coat. Total coating thickness 300um. Color as per clients requirement | |||||||||
Trailer configuration | ||||||||||
1.King pin:2" bolted type | 9.ABS:Standard | |||||||||
2.Landing gear:York 28T two sped manual operation | 10.9Kg*2pcs fire extinguiser with boxes | |||||||||
3.Axle: York 13T*3pcs | 11.Aluminum side fender and mud guard | |||||||||
4.Suspension: Mechanical suspension for 3 axles with steel leaf springs | 12.One piece tool box | |||||||||
5.Tyre:Triangle 10.00R20,13pcs | 13.Aluminum valve box | |||||||||
6.Rim:Steel 10 holes 7.5-20 disc wheel, 13pcs | 14.24V electrical system, 7-pin ISO 1185 socket for the tractor | |||||||||
7.Dual line pneumatic brake system with 6 double air chamber | 15.LED light, heat insulation cable | |||||||||
8.Spare tyre carrier:1 sets | 16.Standard reflective sticker | |||||||||
Новинки товаров от производителей по оптовым ценам











