Гальваническая машина и химическое оборудование для никелирования на молнии цинкового покрытия выпрямитель

Сохранить в закладки 1600399526076:


Цена:12 300,00-48 600,00 $*

Количество:

  • В избранное

Описание и отзывы

Характеристики



Product Description


electroplating machine and chemical zipper nickel plating machinery zinc plating equipment rectifier



Automatic Gantry Barrel Electroplating Line

1.Its has mix function with full-automatic and semi-automatic, with degree of automation .
2.High Productivity ,stable quality ,saving time ,human and area
3.Intelligent operating System:Controlled by PLC .Using the Man-Machine touched interface controlling panel,can monitor and adjust the every process and data.
4.The motor with reducer transmission to insure the barrel rolling .
5.Suitable for the large mass production of large parts .






1. High quality raw material : 10--15mm PP / PVC plate (Welcome customized )
2. Anti-corrosion and resistant machinery frame and Crane lifting : Steel body and Epoxy painting.
3. Main equipment model :

(1) Barrel plating and Hang plating 
(2) Portable equipment ; Manual plating line ; Semi-automatic plating line ; Full-automatic line .
(3) Zinc plating ; Nickel plating ; Chrome plating ; Copper plating ; Gold plating ; Anodizing and etc.
4. Welcome customized
5. Testing before delivery : 
(1) Anti-leakage testing : last 72 hours .
(2) Running testing

6. Our service: Comprehensive after-sales service
(1) Detailed Installation Manual
(2) Guide on-line
(3) Guide on-site

6. Guarantee : one year (Replace the external equipment for free except the human damaged )
7. 
 Surrounding equipments :



Pre-treatment equipment
Ultrasonic degreasing equipment , Washing machine , Vibrating polishing machine
After-treatment equipment
Oven , Dryer 
External equipment
Rectifier , Filter , Chiller
Water cycle system
Input and output plastic pipes and value
Exhaust system
Air cover, ventilation pipe, Exhaust fan , Acid mist tower, Air box










Detailed Images






              PP / PVC plate 





PP welding plating tank



       Brass/PP V-holder



Machinery structure



  Walking area/Operate          platform




      Crane lifting










Plating barrel



Equipment testing before delivery


First testing : Plating tanks testing
First of all , we will test the tanks first . Pour the water into tanks , and stay 72 hours , then check it whether if the tanks will be not seepage , otherwise , the tanks will be given up .




Second testing: Equipment running testing
After tanks testing confirmation , then we will install and running it . After running it one day continuous , the machine is successful . We can deliver it .




Extrenal equipment






Exhaust system & Waste water treatment system






Plating products






Packing & Delivery




Factory


JUNAN TONGDA
This is our factory JUNAN TONGDA ELECTRONIC EQUIPMENT FACTORY which lie in Junan County , Linyi City , Shandong province . We are professional electroplating equipment manufacturer , zinc , nickel , chrome , copper, gold and etc. plating equipment , welcome
your inquiry .





Please feel free contact me , I will reply you in time and do our best !!! 


Welcome your Inquiry


Best wishes !





Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам