Сохранить в закладки 1600405247273:
Model | ZQ127/25Y | ZQ162-50 | ZQ203-100 | ZQ203-100-II | ZQ203-125 |
Pipe Size Range of Master Tong | Φ73-140 | Φ85-162 | Φ101-203 | Φ114-203 | Φ101-203 |
27/8 - 51/2 | 23/8 - 5 | 31/2 - 8 | 27/8 - 8 | 31/2 - 8 | |
High Gear Rated Torque | 3500N.m | 9500N.m | 9500N.m | 9500N.m | 10000N.m |
2581ft-lbs | 7007ft-lbs | 7007ft-lbs | 7007ft-lbs | 7370ft-lbs | |
Low Gear Rated Torque | 25000N.m | 50000N.m | 100000N.m | 100000N.m | 145000N.m |
18349ft-lbs | 36880ft-lbs | 73756ft-lbs | 73750ft-lbs | 106940ft-lbs | |
High Gear Rated Speed | ≤65r/min | 60r/min | 40r/min | 40r/min | 33r/min |
Low Gear Rated Speed | ≤10r/min | 4.1r/min | 2.7r/min | 2.7r/min | 2.2r/min |
Rated Operation Pressure | 16 MPa | 14 MPa | 16 MPa | 16.6 MPa | 18 MPa |
2320 psi | 2030 psi | 2320 psi | 2400 psi | 2610psi | |
Max. Flow | 120 L/min | 120 L/min | 114 L/min | 114 L/min | 120 L/min |
32 gpm | 31.7 gpm | 30 gpm | 30 gpm | 32gpm | |
Pneumatic Operation Pressure | 0.5~0.9MPa | 0.5~0.9MPa | 0.5~0.9MPa | 0.6~1.0MPa | |
72.5~130.5psi | 72.5~130.5psi | 72.5~130.5psi | 72.5~130.5psi | ||
Dimension :L x W x H | 1250x 780 x 1000 | 1570 x 800 x 1190 | 1700 x 1000 x 1400 | 1760 x 1000 x 1630 | 1750 x 1060x 1680 |
Weight(including Backup Tong) | 650kg | 1500kg | 2400kg | 2500kg | 2500kg |
1433lbs | 3310lbs | 5291lbs | 5510lbs | 5512lbs |
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
Новинки товаров от производителей по оптовым ценам