Aerated concrete block equipment (gas filling block equipment) is a new type of building materials machinery equipment. Our company has combined domestic and foreign aerated concrete technology to save resources and protect the environment development. and we can supply complete set of autoclaved aerated concrete plant with 10 000m3, 20 000m3, 50 000m3, 100 000m3, 150 000m3, 200 000m3, 250 000m3, 300 000m3 capacity annually, including plant design, equipments installation, technical instruction, personal training, etc, and also can design and manufacture as per clients' requirement.
![_02]()
Introduction of AAC Block Production Line
1.Storing and supplying of raw materials of AAC blocks:
All raw materials are carried into factory by trucks, such as Fly ash, sand or lime are gathered in specified raw materials field waiting for use. Sacks of cement and bulk cements stored in cement warehouse.
2.Processing of raw materials:
Fly ash, sand or limestone is sent into ball mills by vibration feeders and belt conveyor.Then fine powders of flyash,sand or lime are pumped into slurry tank.
3.Aerated block ingredients,stiring and casting:
Flyash (or sand or stone powder )and waste slurrry are measured in measuring tank.After the measuring and mould in their place,slurry stirring begins. Slurry temperature should reach about 40°c.
Raw material processing
4. Aerated block’s precuring and cutting
Ingredients pouring
Cutting Section.After pouring and foaming, the green body is statically stopped to a certain hardness
AutoclaveAfter cutting the green bodies, they can be marshalled to a certain number by driving and then enter the autoclave for autoclaving.
The normal production capacity:
Annual Capacity(300days) |
Power |
Daily Capacity |
Cycle Time |
No. of Autoclaves |
plant area
(m2)
|
50,000m³/year |
400KW |
166 m³/day |
8 hours |
2 |
2000 |
100,000m³/year |
500KW |
333m³/day |
8 hours |
4 |
2000 |
150,000m³/year |
630KW |
500m³/day |
8 hours |
6 |
2500 |
200,000m³/year |
720KW |
666m³/day |
8 hours |
8 |
3000 |
300,000m³/year |
1186KW |
1000m³/day |
8 hours |
6(D2.85*32.5) |
3500 |