Буровой насос для бурения нефтяных скважин 1500 об/мин 882 кВт дизельный двигатель Chidong PZ12V190B

Сохранить в закладки 1600875983668:


Цена:38 000,00 $ - 40 000,00 $*

Количество:

  • В избранное

Описание и отзывы

Характеристики



Oilfield oil drilling mud pump rig matched 1500rpm 882kw diesel engine Chidong PZ12V190B






Specifications


Model
PZ12V190B
12 hours power
882kw
Rated speed
1500r/min
Fuel oil consumption
≤209g/kW·h
Lubricant oil consumption
≤1.6g/kW·h
L×B×H(mm) Overall size
4301*1980*2678
Net weight
7500kg
Cylinder and Configuration
12 Cylinders, Vee 60°
Type
4-stroke, with turbocharger, intercooler and electronic air/fuel mixer, forced water cooling, direct injection
Bore
190mm
Stroke
215mm
Total displacement
71.45L
Compression ratio
14:1
Direction of Rotation
Counterclockwise(Facing flywheel)
Starting method
Air motor, electric motor
Lubricating method
Pressure and splashing
Speed regulating mothod
Mechanical speed governor, stable speed drop≤8%
Cooling system
Closed type cooling, pure copper water tank


Products Description


1. High configuration: main components are all world-renowned brands, cost-effective, stable and reliable.
2. Multi-option of engine, alternator, PLC remote control system.
Well performed control system & monitor instrument. Easy to operate and maintain, low running cost.
3. Long continuous running hours: 24/7, 8000 hours per year.
4. Low operation and maintenance cost, h
igh return.
5. Manufacturer, OEM provided.


Successful case


1. Russia project
The project is located in Russia, using 3 sets of 600kw natural gas-fired internal combustion generator sets. After the project operation, it provided stable power and heat for the customer's plant.
Equipment gas generation gas generator 1mw natural gas generator 1000kw
Equipment gas generation gas generator 1mw natural gas generator 1000kw
Equipment gas generation gas generator 1mw natural gas generator 1000kw
Equipment gas generation gas generator 1mw natural gas generator 1000kw
Equipment gas generation gas generator 1mw natural gas generator 1000kw



2. Rongcheng Garden Hotel Distributed Energy Station Project
The project is located in the basement of Rongcheng Garden Hotel, Changsha, using 3 sets1.1MW natural gas-fired internal combustion generator sets.
After the project is put into operation, the annual power generation capacity is
4.224 million kW, and the annual standard coal can be saved by 1348.6 tons.
The comprehensive utilization rate can reach 70%-85%.


3. Changsha Huanghua International Airport T2 Terminal Project
This project is located in Changsha City, Hunan Province, using 1.1mw
natural gas generator.
Gas generator Chinese gas engine generator 500kw natural gas generator
Gas generator Chinese gas engine generator 500kw natural gas generator


4.Chengdu Biomass Gas Generation Project
The project is located in Chengdu, with a installed capacity of LY800GH-S biomass gas
generator set. It uses tar-free biomass gas fuel. When the low heat value is
1200kcal/m3, the unit power is 800 kW.


5.Changde Jinshi biogas project
Provided 2 x 1.1MW biogas generator sets forChangde Jinshi Biogas Project, and the
project is under construction.
Gas electric generator remote gas generator 500kw bio gas generator
Gas electric generator remote gas generator 500kw bio gas generator


6. Xiaohuigou Coal Mine Low Concentration Gas Power Generation Project
The project is located in Xiaohuigou Coal Mine, Mayutown, Qingxu County, Shanxi Province.
The construction scale is 10MW, and the annual power generation is expected to be
7200×104kW•h. Provides 10×1MW low-concentration gas engine.


Certificate ,visitors & shipment




Spare parts




Recommend Products




FAQ


Q1. How to find suitable generator?
A:Tell me how many kw you need, and gas type, voltage and frequency, then right model will be recommend.

Q2. What is your transport?
A: Generator set recommend ship by sea or by cargo on land.

Q3. What is your terms of payment?
A: 30% TT in advance as deposit, and 70% balance paid before delivery.

Q4. What is your terms of price?
A: EXW, FOB, CIF, CFR.

Q5. How about your delivery time?
A: Normally 25 days - 50 days after we receive advance payment. Depends on order size and generator model.

Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery. Inspect by third party also acceptable.

You are highly welcomed to ask questions and leave message.


Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам