1. How long does it make an injection mold? Normally it will take our 35-45 days , depending on the complexity and cavity Number of the mold design.
2. How soon can I get the quotation?
In order to quote for you earlier, please provide us the following information together with your inquiry
1) 3D or 2D Drawings ,videos ,samples
2) Material requirement (mold and plastic parts)
3) Surface treatment
4) Quality requirement and other information (such as size/weight/tolerance etc.)
5) Quantity (per order/per month /annual )
6) Any special demands or requirements, such as silk screen , packing, labels, payment and delivery terms etc.
3. How to ensure the mold making methods are correct ?
To avoid the misunderstanding ,We will offer DFM report ( Design for Mold included the parting line, ejector pin
location, plastic thickness, draft etc information) and mold structure for you to check the project detail before
the mold making.
4. How to follow up our order schedule?
Send us inquiry--received our quotation--negotiate order details--sign the contract--pay deposit--confirm the mold
design-- make mold --mold testing--confirm plastic injection molding samples--balance payment of molds
-deposit for plastic molding parts mass production--products inspection and packing -cargo ready-balance payment
-delivery the cargoes--customers feedback and solutions—further cooperation.
5. How about your mold life times?
300000-500000 times
6. What kinds of certificate do you have ?
SGS reports / GB/T19001-2016/ISO 9001:2015
7.Can you provide product assembly service
Yes,we can provide production run and assembly service.
8.How many equipment in your factory?
24 sets high speed precision injection molding machine from 120 T-1000 T
12 sets 250 T injection molding machines in a medical grade and food grade dust-free injection molding workshop
2 sets 400 T two-color injection machines , CNC , drilling , milling etc. other equipment
9.What is your payment term?
T/T or L/C is workable to you, normally we accept T/T 50% with order, and the balance needed to be paid before
shipping.
10. How about your delivery terms?
EXW / FOB ports of Shenzhen / Guangzhou ( or other recommended ports of China)