Single Box Single Cell Precast Box Girder Formwork | ||||||||
1 | Segment length | Maximum width 22m (cell number 1, 2, 3 are available) | ||||||
Segment length | Normally no more than 4m | |||||||
2 | Standard Configuration | External Formwork , Bottom Formwork, Blocking System (Fixed End Formork and Mobile End Formork ), Internal Formwork and Formwork Trolley | ||||||
3 | Options | 1 set of standard configuration includes 2 bottom formwork, and the bottom molds can be added as needed | ||||||
4 | Material | Q235B, Q345Steel. | ||||||
5 | Design time | The preliminary technical plan design will take 3 days. | ||||||
The fabrication drawings will take 5 days to design. | ||||||||
6 | Fabrication | The normal duration is about 40 days. | ||||||
7 | Painting | Each formwork is painted three times: a primer, a middle paint, and a top paint. This prevents rust from corroding the formwork. | ||||||
8 | Delivery | Boyoun maintains positive relationships with many logistics companies to ensure prompt delivery of formworks to the port. | ||||||
9 | Installation on Project site | Boyoun can assign one or two engineers to provide technical support at the project site. | ||||||