ZYTJ BS1139 стандартные кованые леса 48*48 поворотные соединители для труб и зажимных лесов

Сохранить в закладки 1600979872228:


Цена:164,10 ₽ - 240,67 ₽*

Количество:

  • В избранное

Описание и отзывы

Характеристики



Product Description


Product Features
*Brand
ZYTJ
*Style
Pressed 48.3# Double Coupler
*Test Standard
ANSI/Ssfi Sc100-5/05
*Finishing
Zinc Plated
*Origin
Tianjin,China
*Raw Material
Q235
*Hscode
730840
*Transport Package
Plastic Woven Bags and Steel Pallet




Facade
 Backside


Detailed Images




Related Products




Company Introduction


ZhaoYang(Tianjin) Technology Development Co.,Limited. is a Manufacturer and Exporter of scaffoldings with well-equipped testing equipment and strong technical force. With a wide range, good quality and reasonable prices , our products are extensively used in transportation, construction, piling, dredging and other industries. Our ringlock scaffolding & frame system are highly praised by our customers at home and abroad. Our business covers many overseas markets,including America ,Canada,Spain,Southeast area and so on.




Prouction Information
Scaffolding Pipe System is a traditional scaffolding, all the tubes are joined by clamps vertically and horizontally. Clamps
are fixed by screwed Eye bolts. The diamater of the tubes is usually 48.3mm, so the diameter of the clamps are also of 48.3mm. It is widely used in commerical construction, residential construction, industrial construction, oil and gas industry, bridge construction etc.

This British type Swivel coupler is used to connect two tubes at 90 degrees (crossed). Once the bolt and nut are tightened, it isvery strong can load at least 100 KN.
1) Raw material: Q235 steel bar
2) Processing method: drop forged
3) Diameter: 48.3mmx48.3mm
4) Finishing: Zinc plated
5) Processing capacity: 20 containers per month
6) Test Standard: ANSI/SSFI SC100-5/05
7) Package: plastic woven bags and steel pallet.


FAQ


1.Q :Are you trading company or manufacturer?
A:Integration of Industry and Trade

2. Q:How long is your delivery time?
A:The delivery time is within 20-25days.

3 Q:What is your terms of payments?
A:30%T/T in advance +70%balance before shipment or LC at sight

4,Q:What's products do u sell?
A :Ringlock scaffolding ,Frame system ,Catwalk,Steel Props and so on

5 Q:what is your main market?
A:Our main market are Middle East,Australia,Africa and Southeast Area and so on.

6 Q:Can you provide special customized solution for us?
A:Sure ,OEM/OED service is available ,that is one of our business ,please let us know your drawing.


Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам