Эксцентриковые сверлильные инструменты ODEX240 Dth сверла симметричная сверлильная система

Сохранить в закладки 1601038125760:


Цена:8 640,50 ₽*

Количество:

  • В избранное

Описание и отзывы

Характеристики





Product Description


Overburden casing system commonly denotes a methodology employed in specific drilling operations, such as water well drilling, anchoring, micro piling, or geothermal engineering. This technique involves the installation of a casing or pipe through successive layers of soil, rock, or other materials that lie above the target zone. The primary purpose of this casing system is to provide essential support and ensure stability throughout the drilling process. By penetrating and securing the overlying
layers, it prevents cave-ins, collapses, or other undesirable occurrences, thus facilitating safer and more efficient drilling operations. This method plays a crucial role in maintaining the integrity of the borehole, protecting it from potential structural damage, and allowing for the extraction of desired resources or the implementation of various engineering applications.

Here's a general overview of how an overburden casing system works:





1.When drilling starts,the reamer opens
2.When the drilling is finished,reverse the rotation to close the reamer
3.Keep the casing tube left in the hole,or pull out and pour in grout sealing material
4.Use conventional drilling bits to continue the drilling




Product Paramenters


Model
O.D.of Casing Tube
( mm )
l.D.of the CasingTube(mm)
Wall Thickness of the CasingTube(mm)
Max.O.D.of Guide Device(mm)
Match DTH hammer
ODEX90
114
101
6.5
90
COP34/DHD3.5
ODEX115
146
126
10
115
COP44/DHD340/QLX40
ODEX140
168
148
10
136
COP54/DHD350/QL50/SD5
ODEX165
194
174
10
160
COP64/DHD360/QL60/SD6
ODEX190
219
199
10
185
COP64/DHD360/QL60/SD
ODEX240
273
253
10
240
COP84/DHD380/QL80/SD8
ODEX280
325
300
12.5
280
DHD112/DHD380/SD10
Other specifications are available upon request.


Applications


Water well drilling
Eccentric casing system(ODEX) is the main drilling tools in water well projects,which can keep drilling the hole and protecting it from caving in the same time.And it can significantly reduce the drilling time when drilling through the overburden.
Anchoring
Eccentric casing system(ODEX) can meet the requirements of anchoring projects better when reinforcing the slope.
Micro piling
In soil,clay and sand rock formations.eccentric casing system is the most economic and fastest in protecting the hole from
collapsing with permanent or temporary casing tubes.




Products
Instruction
1--Casing tube
a.Thread casing tube.;left-hand
b.Welded casing tube








2--Drill PIpe
Thread:API(REG/IF)/NC




3--Stablizer
Thread of stabilizer consistent with drill rod 





4--Hammer
Thread:API REG






5--Casing shoe
a.Thread casing tube.;left-hand
b.Welded casing tube





6--Eccentric system
See the data sheet as below









Other Casing Tools




Concentric casing system with ring bits
It is suitable for overburden with complex geological conditions, such as pebble, fissure, dry stone, boulder, construction backfield waste, etc. It can be drilled at any angle with high straightness.
The maximum diameter of the hole can reach 1550 mm.


Concentric casing system with blocks
1.The material of joint tools is better than casing tube and after heat treatment, the connection is reliable.
2.The casing shoe is heat-treated to extend the service life.
3.The blocks and locking kit are strengthened and have good comprehensive performance
4.Application fields: pile foundation engineering, slope support engineering


Concentric casing system with wings
It is suitable for covering layers with loose materials, such as soil, clay, weathered rock, and sand particles.


Our Company








Our Certifications




Packing & Delivery






Packing Details  : Wooden cases

Delivery Details : 15-18days after get the deposit



FAQ


Q: Are you trading company or manufacturer ?

A: We are factory.



Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.



Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.



Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:





Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам