Карбид вольфрама Концевая фреза с длинным горлышком квадратный резак HRC55 микро фреза малого диаметра

Сохранить в закладки 1601055704674:


Цена:*

Количество:

  • В избранное

Описание и отзывы

Характеристики



Product Description




Specification


Long neck square
d₁
L₁
L₂
d₂
D
L
Price (USD)
0.2*4D*50L-L1
0.2
0.3
1.0
0.16
4
50
2.78
0.2*4D*50L-L2
2.0
0.3*4D*50L-L1
0.3
0.5
1.0
0.26
4
50
2.78
0.3*4D*50L-L2
2.0
0.3*4D*50L-L3
3.0
0.4*4D*50L-L2
0.4
0.6
2.0
0.36
4
50
2.64
0.4*4D*50L-L3
3.0
0.4*4D*50L-L4
4.0
0.4*4D*50L-L6
6.0
0.5*4D*50L-L2
0.5
0.7
2.0
0.45
4
50
2.64
0.5*4D*50L-L3
3.0
0.5*4D*50L-L4
4.0
0.5*4D*50L-L5
5.0
0.5*4D*50L-L6
6.0
0.5*4D*50L-L8
8.0
0.6*4D*50L-L2
0.6
0.9
2.0
0.55
4
50
2.64
0.6*4D*50L-L3
3.0
0.6*4D*50L-L4
4.0
0.6*4D*50L-L5
5.0
0.6*4D*50L-L6
6.0
0.6*4D*50L-L8
8.0
0.7*4D*50L-L3
0.7
1.0
3.0
0.65
4
50
2.64
0.7*4D*50L-L4
4.0
0.7*4D*50L-L5
5.0
0.7*4D*50L-L6
6.0
0.7*4D*50L-L8
8.0
0.7*4D*50L-L10
10.0
0.8*4D*50L-L3
0.8
1.2
3.0
0.75
4
50
2.64
0.8*4D*50L-L4
4.0
0.8*4D*50L-L5
5.0
0.8*4D*50L-L6
6.0
0.8*4D*50L-L8
8.0
0.8*4D*50L-L10
10.0
1.0*4D*50L-L4/L5
1.0
1.5
5.0
0.95
4
50
2.50
1.0*4D*50L-L6
6.0
1.0*4D*50L-L8
8.0
1.0*4D*50L-L10
10.0
1.0*4D*50L-L12
12.0
1.0*4D*50L-L14
14.0
1.0*4D*50L-L16
16.0
1.0*4D*50L-L20
20.0
1.5*4D*50L-L6
1.5
2.3
6.0
1.45
4
50
2.50
1.5*4D*50L-L8
8.0
1.5*4D*50L-L10
10.0
1.5*4D*50L-L12
12.0
1.5*4D*50L-L14
14.0
1.5*4D*50L-L16
16.0
1.5*4D*50L-L20
20.0
2.0*4D*50L-L8
2.0
3
8.0
1.95
4
50
2.50
2.0*4D*50L-L10
10.0
2.0*4D*50L-L12
12.0
2.0*4D*50L-L16
16.0
2.0*4D*50L-L14
14.0
2.0*4D*50L-L20
20.0
2.5*4D*50L-L12


2.5


3.8
12.0


2.4


4


50
2.50
2.5*4D*50L-L16
16.0
2.5*4D*50L-L20
20.0
3.0*4D*50L-L12
3.0
4.5
12.0
2.9
4
50
2.50
3.0*4D*50L-L16
16.0
3.0*4D*50L-L20
20.0
3.0*6D*60L-L12
3.0
4.5
12.0
2.9
6
60
4.17
3.0*6D*60L-L16
16.0
3.0*6D*60L-L20
20.0
3.0*6D*75L-L26
26.0
75
5.22
3.0*6D*75L-L30
30.0
4.0*6D*60L-L16
4.0
6.0
16.0
3.9
6
60
4.17
4.0*6D*60L-L20
20.0
4.0*6D*75L-L26
26.0
75
5.22
4.0*6D*75L-L30
30.0




Packing & Delivery




To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.


Company Profile








As the larger super-hard cutting tool manufacturer,the products are well-known inthe industry.Tianyu has become the excellent supplier to many well-known companies;we not only can supply the all-round,muliple-series and systematic products but also the best turn-key solution to customers.Holding the spint -Providing the best products and technical service,Tianyu has gained abundant experience in the development,manufacture and application service ofsuper-hard cutting tools.
Long Neck square design for high efficiency and high quality milling.The rigid tool geometry offers longer tool life when milling Hard Materials.coat is adopted which maintains heat resistance, toughness and lubricity at a high level.Both dry and wet coolant offer stable and long tool life.
The shank taper angle is not an exact value and to avoid contact with he work piece, we recommend the user controls the precise value of this angle. Shank taper angle should not make contact with the work piece.


FAQ


1) When can I get the price?
We usually quote within 12 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in
your email so that we will regard your inquiry priority.

2) How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design
and paper quality, we will provide you sample for free, as long as you afford the express freight.

3) How long can I expect to get the sample?
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3 days. The samples will be
sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an
account.

4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 15-30 days. We need 7-15 days to prepare all the stuff then 15 days
for manufacturing.

5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are.It could
be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long
as you afford the traffic expense.

6) Are you trading company or manufaturer?
We are a professional integrated business of industry and trade. We not only owns our tool factory, but also have cemented carbide
factory and a complete supply chain system.We have rich experience in production experience, high-volume production orders.

7) Where is your factory located?
We are located in No. 20 Jiangnan West Street, Chang'an Town, Dongguan City, Guangdong Province.

8) How about your stock?
We have a large inventory of products, with regular models and sizes in stock. All items that can be paid directly are in stock.
If you are unsure, please contact us.

9) Is free shipping possible?
We do not offer free delivery services. If you purchase a large quantity of products, we can pay for the shipping cost.


Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам