Сохранить в закладки 1601090583453:
Product Brief Introduction
Advantage
1. The rollers are wear-resisting chromium molybdenum copper alloy with long service.
2. The gap between the rollers is adjustable so that the output size and capacity will be changed accordingly.
3. This crusher is equipped with a motorless scraper. When the raw material has a high moisture content, it can avoid affecting the output size and avoid sticking the roller or blocking the machine.
4. According to requirement, it could be in flat roller or toothed roller.
Working Principle
| Model | Roller Diameter (mm) | Roller Length (mm) | Feeding Size (mm) | Output Size (mm) | Capacity (t/h) | Motor Power (kw) |
| 2GP-400X250 | 400 | 250 | ≤ 25 | 1-8 | 5-10 | 5.5*2 |
| 2GP-500X450 | 500 | 450 | ≤ 30 | 1-15 | 10-20 | 11*2 |
| 2GP-610X400 | 610 | 400 | ≤ 40 | 1-20 | 13-35 | 15*2 |
| 2GP-750X500 | 750 | 500 | ≤ 40 | 2-20 | 15-40 | 18.5*2 |
| 2GP-800X600 | 800 | 600 | ≤ 40 | 3-20 | 20-50 | 22*2 |
| 2GP-1000X500 | 1000 | 500 | ≤ 120 | 3-20 | 30-60 | 37*2 |
| 2GP-1100X600 | 1100 | 600 | ≤ 150 | 3-20 | 50-80 | 37*2 |
| 2GP-1000X1000 | 1000 | 1000 | ≤ 120 | 3-20 | 60-80 | 45*2 |
20 national service mileage:
Service mileage for local customers to provide equipment installation, commissioning, and after-sales service

1. Are you a manufacturing or trading company?
We are a factory, established in 2003.
2. How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3. What is your payment method?
There is a 30% deposit in T/T advance and a 70% balance before shipment.
4. How long is the warranty? Does your company supply the spare parts?
One year. Spare parts for you at the lowest cost.
5. If I need the complete crushing plant can you help us to build it?
Yes, we can help you set up a complete production line and give you related professional advice. We have already built many mining projects in China and overseas.
Новинки товаров от производителей по оптовым ценам












