Малогабаритная дорога 1 5 тонны 2 железнодорожные подземные электровозы с литиево свинцово кислотными аккумуляторами и гидравлическим тормозом

Сохранить в закладки 1601093782705:


Цена:747 123,36 ₽*

Количество:

  • В избранное

Описание и отзывы

Характеристики


Product Description


The length of the entire Underground Coal Mine battery locomotive for mining is only 1.66 meters, which is directly below the cage.


The self-developed three-stage gearbox design is small in size and large in speed ratio, which improves the traction of the entire Underground Coal Mine battery locomotive for mining.


All gearbox gears are made of 40CrMnTi, heat treatment process, high strength and impact resistance.


The engine casing is processed by seamless steel tubes, specially developed for mine conditions, resistance to moisture and earthquakes.


The steel wheel is cast in manganese steel, wear resistant and durable.


The appearance of the entire 2.5T Underground Mine Electric Trolley Locomotive electric locomotive is electrostatically sprayed, which is more resistant to corrosion.


The external structure of the Underground Coal Mine battery locomotive for mining is screwed in for ease of maintenance.


Explosion-proof drive battery to prevent equipment downtime caused by the battery.


Regulation Cutter speed regulation, steady start, effectively protect engine and gearbox gear from impact.


wireless remote control function is optional, 100 meters remote control range, safer and more efficient.


Model CTY5.0 railway electric Lithium/lead-acid battery locomotive pulling 40T in mining tunnelModel CTY5.0 railway electric Lithium/lead-acid battery locomotive pulling 40T in mining tunnel


Model CTY5.0 railway electric Lithium/lead-acid battery locomotive pulling 40T in mining tunnel


Model CTY5.0 railway electric Lithium/lead-acid battery locomotive pulling 40T in mining tunnel


 


 


Product Parameter


 





















































































Specification/ParameterValue
NameCTY2.5/6GB(A single motor)
Adhesive weight2.5t
Dimensions (L x Wx H)1660(2100)*970*1550mm
Traction power rating4kw
Rated weight18t(About 12 0.75 cubic meters of mining wagon )
Rated traction4.7KN
Maximum Traction7.23KN
Traction Height320mm
Brake modelDouble-axle four-wheel hydraulic disc brake self-locking (pedal type)
 Chopper speed regulation
Speed regulationResistor controlled
TransmissionTriple gear reduction
Charger power2.5kw
Battery Capacity330AH
Speed (km/h)5.8km/h
Wheel diameter460mm
Min. turning radius4m
Wheelbase750mm
Track gauge600mm






































































































Specification/ParameterValueValueValueValueValue
Adhesive weight1.5t2.5t2.5t5t8t
Dimensions (L x Wx H)1660*950*1550mm1660*970*1550mm1660*970*1550mm231*970*1550mm

4580*1095*1550mm


Traction power rating4kw4kw8kw(4kw*2)15kw(7.5kw*2)22kw(11kw*2)
Traction3.8KN4.7KN4.7KN10KN17KN
Rated weight11t(About 7 0.75 cubic meters of mining wagon )18t(About 12 0.75 cubic meters of mining wagon )18t(About 12 0.75 cubic meters of mining wagon )35t(About23 0.75 cubic meters of mining wagon )56t(About 30 1.05 cubic meters of mining wagon )
Charger power2.5kw2.5kw2.5kw5kw5kw
Charging time6h8h8h8h8h
Using time10h10h10h10h10h
Electrolyte capacity102L102L102L210L420L
Speed (km/h)5.8km/h5.8km/h5.8km/h5.8km/h6.8km/h
Min. turning radius4m4m4m4m7m


2.5T Mining Underground Mining battery locomotive for mining DetailsModel CTY5.0 railway electric Lithium/lead-acid battery locomotive pulling 40T in mining tunnel

A Variety Of Machine Are Available:



Company Profile

-1

Yantai Zlinktric Mining Equipment Co., Ltd. is the production of mining equipment and accessories for the main science and technology enterprises, the company is located in scenic coastal city - Longkou city, where three sides sea, odds abundance, east of Yantai, Qingdao to the south, near the port, sea and air transport West Longkou is very convenient. The company has a modern enterprise management mechanism, first-class processing equipment, iperfect testing equipment, high-quality scientific research staff, (in cooperation with Huazhong University of Science and Technology) and quality tracking services. Production and sales of hydraulic tunnel now separation machines, battery operated Underground Coal Mine battery locomotive for mining, belt loader, spine rails, bathtub and other mining equipment. And work to achieve a relationship between the devices through the intelligent control system for production operations in the mine to improve work efficiency and reduce security risks. We look forward to your choice, and always ready to provide you with the most dedicated service.

Packing And Shipping

1

RFQ

1. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
2. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
3. How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment. Sometimes we have them in stock.The specific delivery time depends on the items and the quantity of your order.
4. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
5: How do you make our business long-term and good relationship?
Relying on scientific and technological innovation, customer satisfaction as the goal, equipment to provide customers with quality products and comprehensive after-sales service.

Model CTY5.0 railway electric Lithium/lead-acid battery locomotive pulling 40T in mining tunnel

 


 


 


 


 



Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам