ADAPT TO EXCAVATOR TYPE:Escavatore、Backhoe、Telehandler.
Construction of roadbed: the settlement and deformation of the base layer of the highway, after excavating the surfacelayer, the soft mud of the foundation is hardened about 1 meter deep, so as to complete the repair of the roadbed.
Site hardening: hardening treatment of parking lots, stockyards for material or goods, driling well sites, production and Drocessing plants,etc.
Anti-sedimentation and solidifcation of pipe corridors and ditches: when the pipeline construction passes through thesilt land, there is no need to excavate the silt out and transport it to elsewhere, just solidify and then excavate, finallybackfll the solidifed soil.
Solidifcation of marshland: solidifcation of marshland to build constructableland, build large factories, no need toexcavate and transport the sludge, just solidify and reuse sludge on site.
River bed solidifcation: After solidifying the river bed silt, then leveled it to build a beautiful river.
Bridge and tunnel: The surface foundationsolidifcation of the bridge, and the tunnel sludge is solidifed and thenexcavated as a flling material.
Solidifcation in the landfl: The landfll has accumulated various corrosive substances such as sludge, oil and plastic fora long time, we can built a park on it after solidifcation and burying.
Remediation and improvement of heavy metal contaminated soi: soil heavy metal stabilization, engineeringremediation of contaminated soil, vegetation restoration, and reduction of the potential dangers of heavy metals incontaminated soil to the ecological environment and human health.
Contaminated soil remediation and acid-base neutralization: soil heayy metal content exceeds the standard and isalkaline, and acid-base neutralization is carried out through our soil stabilization systemequipment.