Хит продаж сельскохозяйственный дизельный мини погрузчик с бортовым гусеничным погрузчиком насадками

Сохранить в закладки 1601174924452:


Цена:1 600,00-1 900,00 $*

Количество:

  • В избранное

Описание и отзывы

Характеристики



Product Description






Specification


ZM-T360
Machine Rating
Dimensions
ITEMS
SPECIFICATIONS
ITEMS
SPECIFICATIONS
Engine Brand
KOOP
Briggs & Stratton
Height at Maximum Extension/mm
2450
Rated Power/HP
13.5
Height To the the bucket pin /mm
1870
Rated Speed/rpm
3000
Vehicle height
1300
1
Maximum Height as Lay the bucket flat/mm
1810
Air intake way
Naturally Aspirated
Total length without appendages/mm
1450
Displacement/cc
420
Length With standard bucket /mm
2100
Emissions Standards
EUR 5-EPA
Maximum height unloading Angle
34°
Rated Operating Capacity/Kg
200
Dumping Height/mm
1510
Maximum Operating Capacity/Kg
300
Discharge Distance/mm
450
Maximum Breakout Force/KN
350
The flip Angle of the bucket on the ground
27°
Bucket Capacity/m3
0.12
Bucket flip Angle at highest Pos.
114°
Driving Speed/ km/h
0-6
Wheel Base/mm
850
Total Cycling Time/s
9
Ground Clearance/mm
150
System Operating Pressure /bar
17-21
Tail Length/mm
280
Fuel Tank Capcity/L
5
Wheel base
(standard tire) /mm
720
Operating Weight/Kg
900
Vehicle width
(standard tire) /mm
880
Tyre Size
15*72
Bucket width/mm
1000


Details Images






Company Profile






Our Advantages










FAQ


1.Are you a manufacturing factory or a trading company?
Middling coal Group is the manufacturing base of mine supporting equipment, transportation equipment, lifting equipment, spray equipment, drilling equipment, ventilation equipment and other products of road machinery (excavators, spider cranes, rollers and other large road equipment).

2. Where is your factory?
We currently have a factory in China. One of them is located in Jining City, Shandong Province, China. Warmly welcome you to visit anytime.

3. What are your main products?
We mainly produce road machinery, mining machinery, and railway equipment. We can provide you with any machine you need!

4. How long is the production leadtime?
Generally it is 15-20 days for goods in stock. In the case of out of stock or large
orders, it will take 20-30 days. QTY of the orders will be taken into consideration.

5. What payment terms do you accept?
Payment terms: TT in advance (30% of deposit before production and 70% balance before shipment), bank transfer, Paypal, L/C etc.

6. How do your quality control systems operate?
We have professional designer team, and employ experienced engineers to strictly guarantee the production. Meanwhile our factory owns ISO9001 and is CE and SGS certified.



Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам