Сохранить в закладки 1601198712929:
Items
| Units
| Parameters | |
HBTS40-10-37 | |||
Whole performance of machine | Max. theo. concrete capacity | m3/h | 40 |
Max.concrete pumping pressure | MPa | 10 | |
distribution valve type |
| S Valve | |
Concrete cylinder diameter×stroke | mm | 140×845 | |
Hopper capacity×feeding heigh | L×mm | 400×1100 | |
Outlet diameter | mm | 100 | |
Electrical engineering power | kW | 37 | |
rated speed | r/min | 1480 | |
Hydraulic system | Circuit type |
| Open circuit |
Pumping system pressure | MPa | 18 | |
Mixing system pressure | MPa | 6-8 | |
Capacity of oil tank | L | 260 | |
Other parameters
| Max pumping distance(vertical/horizontal) | m | 100/300 |
Max. aggregate diameter | mm | pebble 20 | |
pumping pipe diameter | mm | 80-100 | |
Dimensions:length×width×height | mm | 3400X1420×1600 | |
Total weight | kg | 2300 |
Q1: Are you trading company or manufacturer?
A: We are manufacturer.
Q2: How long is your delivery time?
A: Generally it is 3-7 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.
Q4: Do you have CE certificate for your concrete batching plant / cement silo?
A: Yes, we have. Both are our patent products, certificated by CE.
Q5:Can your engineers train our workers in our factories?
A:Yes, we have a very large engineering installation team that can train and instruct your workers to operate the installation equipment.
Новинки товаров от производителей по оптовым ценам