Сохранить в закладки 1601234806415:
Material | 6061-T6 Aluminium Alloy |
Main Components | Beam, Column, Wall, Staircase, Others: floors, slab... |
Aluminum Formwork Accessories | Wedge, pin, tie rod, wing nut, washer, bolt, cone, waler stopper, form tie, coupler, clamp, pusher and so on. |
Safe working load | 60KN/m2 |
Construction period | 4 days per storey |
Wall Panel Size | Length: 2300mm; 2450mm; Wideth: 300-600mm; or custom-made |
Beam Panel Size | Length: 1500mm; Wideth: 100-400mm; or custom-made |
Slab Panel Size | Length: 1200mm; Wideth: 200-600mm; or custom-made |
Column Panel Size | Length: 3000mm; Wideth: 100-600mm; or custom-made |
Features | Lightweight |
One-time Pouring | |
Cost-Effective | |
Resist moisture | |
Reused over 300 times | |
Recyclable | |
Environmental Friendly |
CIEZN Aluminium Formwork can be used widely in the construction of high-rise building (Hotels, hospitals, office buildings), residential units and mass housing projects.
It is fast, simple, adaptable and cost effective.
It produces total quality work which requires minimum maintenance and when durability is the prime consideration.
Characteristics | Steel Formwork | Plastic Formwork | Timber | Aluminum Formwork |
Easy construction, low dependence on equipment | √ | √ | ||
Form staircase with accurate dimensions for riser and thread | √ | |||
High strength&bearing capacity | √ | √ | ||
Suitable for high-rise buildings | √ | |||
Dismantle slab panels without moving props | √ | |||
Excellent concrete surface quality without plastering | √ | √ | ||
Easy to combine with other types of formwork | √ | √ | ||
Recycle utilization, less average cost | √ | |||
High speed of construction, save time cost | √ | √ | ||
Self correction feature provides unmatched forming accuracy | √ | √ | ||
Environment-friendly, no construction waste | √ | √ |
Q-:Can I use this set of formwork to another project?
Yes, there are nearly 70% standard panels can be common reused.
-Q-:What's your packing methods?
Wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.
-Q-:What's your payment terms?
T/T 30% in advance & T/T 70% before shipping to port, L/ C 100%, or negotiate according to the order status
-Q-:Are you manufacturer or trader?
A: CIEZN is the manufacturer of aluminum formwork system for more than 10 years.
-Q-:If I don't have construction crew knew well about your forwmork system, what can I do?
Well, we will send one field specialists to your construction site for guidance if you require.
-Q-: Do you have pre-mocking up service?
Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently,
then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.
-Q-: How to proceed an order for aluminum formwork?
1- Please provide completed project drawings to us.
2- CIEZN design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.
3- Construction details confirmed, sign sales contract, receiving deposit.
4- To work out shell drawings and modulation drawings.
5- Have meeting for confirming model details.
6- Production.
7- Acceptance and check.
8- Shipping.
Новинки товаров от производителей по оптовым ценам