2024 новая модель 3 5 т/ч мобильного оборудования для поиска золота

Сохранить в закладки 1601237379480:


Цена:3 390,00 $ - 3 880,00 $*

Количество:

  • В избранное

Описание и отзывы

Характеристики









ATV 5 TPH Gold Shaker Wash Plant & 6.5 Kw Generator
Make
Downunder4gold
Model
DMT-5
Name
ATV gold washer
Capacity
2.2-3.3 YPH (3-5 TPH)
Supply Voltage
380 Volt
Water Connection
2 inch Water Feed with Camlock Fitting
3in Water Manifold with Additional Outlets
Requires 2 inch Water Pump (15-20m³/h,250-330 GPM)
Vibrating feed hopper
With water spray bars, Vibrating Motor
Adjustable hopper angle
Adjustable water pressure
Sluice box
2000*400mm (Length, Width)
Expand mesh, Rubber mat, Miner moss, Other mats optional
Screen
Round hole, 8~20mm optional ,Default size 12mm
Replaceable after wear out
Mobile
ATV wheels and trolley
13 inch wheel
4 pcs Jack leg, leveling easy
Trolley help to easy move, optional
Diesel generator
6.5KW, Changchai brand
15 Liter diesel tank, 380V/220V
Accessories
2 inch submersible water pump
20 seters 2 inch Layflat with camlock
Cables, 20 meters for pump, 8 meters for ATV shaker
Optional
Trolley for easy to move, LED with post
Package
ATV gold shaker, 2050*820*1100mm, wood box
Generator, 810*550*660mm, carton
Quantity load
12 units/20GP, 24 units/40HQ






























Q: Are you a factory ?
Reply: Yes, we are factory, 3200 square meter workshop and office.

Q: What is gold recovery rate of your equipment ?
Reply: All gravity recovery methods are highly dependent on particle size and shape.
Besides operational variables, such as feed presentation (screen aperture, feed rate, solids/water ratio) and sluicebox design (i.e. length, width, slope, riffle pattern), the gold particle size distribution and shape are inherent factors determining the gold recovery rate.
anyone say that equipment recovery is 80%, 90% something is not true. it’s all depends. but 90% of placer mining gold wash plant will use sluice boxes rather than jig, concentrator, etc.

Q: Gold trommel vs Gold shaker deck ?
Reply: While the capital equipment cost for trommel and shaker decks of equal diameter/width is
similar,trommel screen plants come with the advantage of longer maintenance intervals and slightly lower operating costs for maintenance. The shaker deck design handles higher tonnage throughput and providesthe opportunity for running a primary sluice run in the screen under pan. Downunder4gold offers both trommel and shaker deck wash plants that can be configured to most ground conditions.

Q: What is difference of Downunder4gold equipment ?
Reply: we consider more than others how to ensure our plant will work well on mine site. we spend years on designing new model, we combine all the good thing others mining experience. we are compete with suppliers from Canada, USA, South Africa. Downunder4gold supply ratio from 5 tons per hour upto 500 tons per hour. we have hydraulic riffle sluice box, miner moss, rubber mat. gold trommel, gold scrubber trommel, shaker screen (deck). that can be configured to most ground conditions.

Q: What is delivery time ?
Reply: Most of our model will be in stock, after recieve deposit 10-15 days. if no stock, take 3-4 weeks for production.

Q: Are you supply accessories used on gold wash plant ?
Reply: Yes, we supply all accessories and tools, such as water pump, layflat hose, diesel generator, even we can out sourcing trucks, Wheel loader, Bulldozer, Excavator.
we will put orders together in our factory, and we can book the shipment for our client.


Q: Do you supply installation service ?
Reply: Yes, Downunder4gold will give the installation guide to our client. most of our wash plant model are modular, easy and fast installation. remote installation will help in most case.





Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам