Q: What materials can you process?
A: Carbon steel, stainless steel, aluminum alloy, brass, copper and other type of alloy
Q: What’s the MOQ?
A: The MOQ is one piece, it could be adjusted according to the production difficulty and cost
Q: What’s the leading time?
A: For the sample the leading time is 3-7 days, for mass quantity, the leading time is 15-30 days
Q: Can I get a sample for check?
A: Of course, but there is a sampling fee, we will return it back in mass production.
Q: What if I want to customize a part but I can not provide the design?
A: We could provide design services as long as you tell us all the requirements or send the sample.
Q: I want to keep our design in secret, can we sign NDA?
A: Yes, we can sign the NDA before you send the drawing.
Q: How can I get a quotation from your company?
A: Click the button of “Contact Supplier”, in order to quote you as soon as possible,we need the following information.
1. Detailed drawings (format: 2D, PDF, DXF, DWG, 3D, STEP, IGS, PRT etc)
2. Material
3. Quantity
4. Surface treatment
5. Any special packing or other requirement
Q: How do you usually pack your products?
A: The finished products will be packed individually and according to the requirement of our clients with PE material, the well packed product will be put in carton box or wooden box.
Q: Do you provide after sale service?
A: If there are any problem after receiving the product, our service team would provide the service through voice call, video
conference, email, etc.
Q: Which payment term would be accepted?
A: We accept T/T, Paypal or Alibaba trade assurance