500 TPH золото шлака россыпь горнодобывающая стиральная

Сохранить в закладки 1601239485060:


Цена:16 080 829,80 ₽*

Количество:

  • В избранное

Описание и отзывы

Характеристики









DMT-500 gold trommel wash plant
Make
Downunder4gold
Model
DMT-500
Name
Gold shaker deck, vibrating screen washer
Capacity
300 YPH (500 TPH)
Supply Voltage
380 Volt
Water Connection
2 pcs*12 inch Water Feed with Camlock Fitting
Floating water pontoon optional
Diesel water pump prefered
Feed hopper
Dump truck feeding
Hopper width 4.8 meter, length 5.5 meter
Volume: 30m³
2 pcs*4 inch water cannon
Sluice box
2050*12000 mm*4pcs (Length, Width, Quantity)
Hydraulic riffle,Expand mesh, Rubber mat, Miner moss, Other mats optional
Screen box
2 decks newest design vibrating screen
Screen dimension: 2000*6000mm
Top screen: 20 mm thick, high manganese steel plate laser cutting screen hole. bottom screen use high manganese welding mesh or woven mesh. 
Screen opening: top deck 80-100 mm, bottom deck 10-30 mm optional, default size 14 mm
Structure
Heavy duty steel foot base, 400 mm square pipe, 300 mm square pipe, Q 345 steel, 
Diesel generator
200kw generator
PLC control
Transmission power
30 kw motor 
Optional gravity separation method
Sluice box, centrifugal concentrator
Total weight
55 ton
Quantity load
Total loaded with 2*40 HQ, and extra 40 m³ bulk on deck shipping




























Q: Are you a factory ?
Reply: Yes, we are factory, 3200 square meter workshop and office.

Q: What is gold recovery rate of your equipment ?
Reply: All gravity recovery methods are highly dependent on particle size and shape.
Besides operational variables, such as feed presentation (screen aperture, feed rate, solids/water ratio) and sluicebox design (i.e. length, width, slope, riffle pattern), the gold particle size distribution and shape are inherent factors determining the gold recovery rate.
anyone say that equipment recovery is 80%, 90% something is not true. it’s all depends. but 90% of placer mining gold wash plant will use sluice boxes rather than jig, concentrator, etc.

Q: Gold trommel vs Gold shaker deck ?
Reply: While the capital equipment cost for trommel and shaker decks of equal diameter/width is
similar,trommel screen plants come with the advantage of longer maintenance intervals and slightly lower operating costs for maintenance. The shaker deck design handles higher tonnage throughput and providesthe opportunity for running a primary sluice run in the screen under pan. Downunder4gold offers both trommel and shaker deck wash plants that can be configured to most ground conditions.

Q: What is difference of Downunder4gold equipment ?
Reply: we consider more than others how to ensure our plant will work well on mine site. we spend years on designing new model, we combine all the good thing others mining experience. we are compete with suppliers from Canada, USA, South Africa. Downunder4gold supply ratio from 5 tons per hour upto 500 tons per hour. we have hydraulic riffle sluice box, miner moss, rubber mat. gold trommel, gold scrubber trommel, shaker screen (deck). that can be configured to most ground conditions.

Q: What is delivery time ?
Reply: Most of our model will be in stock, after recieve deposit 10-15 days. if no stock, take 3-4 weeks for production.

Q: Are you supply accessories used on gold wash plant ?
Reply: Yes, we supply all accessories and tools, such as water pump, layflat hose, diesel generator, even we can out sourcing trucks, Wheel loader, Bulldozer, Excavator.
we will put orders together in our factory, and we can book the shipment for our client.


Q: Do you supply installation service ?
Reply: Yes, Downunder4gold will give the installation guide to our client. most of our wash plant model are modular, easy and fast installation. remote installation will help in most case.



Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам