Конкурентоспособная цена колесный Железнодорожный экскаватор шпатель укладка оборудования

Сохранить в закладки 1601240771485:


Цена:657 890,40 ₽ - 679 820,08 ₽*

Количество:

  • В избранное

Описание и отзывы

Характеристики







Model
75
use to
Replacement and grabbing of sleepers
Applicable host(ton)
60-20T
Applicabletrack gauge Millimeter (mm)
1000mm、1067mm、1435mm、1520mm(Customizable)
Speed of changing sleepers Root/hour (t/h)
30-60
Sleeper clamp with open mouth(mm)
650
Maximum slag removal width (mm)
2800
Slag removal depth Kilometers per hour (km/h)
400
rotation (mm)
360


Main technical and performance characteristics.
The multifunctional railway machine adopts the temporary 75 high-power plateau version of the special railway machine. The trackgauge is designed to be 1610mm, which is more suitable for the domestic standard rules. The counterweight is increased by 450kg,and the safety factor is relatively high during railway operation. The main body adopts high strength alloy plate, high strength,wear resistance; Diversified functions, with functions such as pillow change, track change, ballast cleaning and screening; It canrealize free up and down on the ballasted line, and the crawler is equipped with rubber plate to ensure walking on the railwithout damaging the rail. It is equipped with front and rear rail guide mechanisms, and can lock the road steering mechanism whenwalking on the rail to ensure the safe walking function of the railway The rotation of the working arm adopts the rotation limitoperation mode: 360 rotation, 180 reciprocating rotation on the left and 180 reciprocating rotation on the right, which can meetthe requirements of double-track safety operation; The working arm adopts the high limit operation mode, the height can be
adjusted, and the touch limit switch will automatically stop the action, which can be suitable A reversing horn is installed atthe end of the fuselage, which can automatically remind you by voice when reversing; The use of hydraulic quick connector canrealize the quick replacement between the pillow changing device and various operation accessories, so that the host has a widerrange of operations, saves time and improves work efficiency. It is equipped with a DC emergency system. When the engine orhydraulic pump fails, the pillow changer can be operated away from the dangerous area through the emergency system.; The railwaypillow changing machine modified by our company has passed the evaluation of scientific and technological achievements(certificate number: 202237HJ1663). The products of this project have rea






Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам