Ordering a container shelter involves several steps, from selecting the right type and size to finalizing the purchase. Here’s a
step-by-step guide on how to order a container shelter:
### Step 1: Determine Your Needs
1. **Purpose**: Decide on the purpose of
the shelter, such as storage, workspaces, or equipment protection.
2. **Size**: Measure the area where the shelter will be placed
and determine the size of the container(s) you want to cover.
3. **Features**: Consider additional features you might need, such as ventilation, lighting, and locking mechanisms.
### Step 2: inquiries.
Contact the Manufacturer 1. **Initial Inquiry**: Reach out to the manufacturer via phone or email to
inquire about the available models and pricing.
2. **Customization Options**: Discuss any customization options, such as color,size, and additional features.
3. **Technical Support**: Ask for technical support or advice if needed, especially if you have
specific requirements.
### Step 3: Request a Quote 1. **Detailed Specifications**: Provide detailed specifications of the shelter
you need, including size, materials, and features.
2. **Budget**: Mention your budget to help the manufacturer suggest suitableoptions.
3. **Delivery Details**: Discuss delivery timelines and costs.
### Step 4: Place the Order 1. **Confirmation**: Confirm the order details, including the final price, delivery date, and payment terms.
2. **Deposit**: Pay the required deposit or full payment as per the agreement.
3. **Documentation**: Receive and review any necessary documentation, such as contracts or purchase orders.
### Step 5: Prepare for Delivery
1. **Site Preparation**: Prepare
the site where the shelter will be installed, ensuring it is level and clear of obstructions.
2. **Installation Services**:
Inquire about installation services if needed.
3. **Tools and Equipment**: Gather any necessary tools and equipment for
installation.
### Step 6: Receive and Install the Shelter
1. **Inspect Upon Arrival**: Inspect the shelter upon arrival to ensure
there are no damages or missing parts.
2. **Professional Installation**: If professional installation is provided, schedule a
convenient time for the installation team.
3. **Self-Installation**: If you are installing the shelter yourself, follow the manufacturer’s instructions carefully.