Сохранить в закладки 1601269019844:
Large Outdoor Amusement Equipment Carnival Fair Attractions Spin Motorcycle Car Luna Park Games
Note: The price is a partial deposit price, please contact us for details.
QiangLI equipment exhibition hall covering an area of 1,000 square meters
1.Mini Shuttle Bus occupies a small area with low investment cost and a short payback period. It is easy to operate with a small operating radius, suitable for various complex sites. Once in operation, it can attract a large number of visitors, helping your amusement park achieve quick profitability.
2.Made of high-quality materials and strictly controlled production processes. Equipped with an intelligent safety system. Safety measures designed for children, such as child-specific safety door locks and height restrictions. Features an intelligent control system that monitors the equipment’s operating status in real-time.
3.Suitable for the whole family to experience together.
4.We have a professional after-sales service team to provide you with comprehensive technical support and training.
Capacity | 18persons |
Space Area | 10*10m |
Height | 4.5m |
Power | 12Kw |
Voltage | 380V |
Cabin | 6pcs*3persons |
Included | Light and Music |
Where there is joy, there is QiangLi
65,000 m² production workshop,6 automated production lines.
10+ R&D designers, providing comprehensive planning.
700+ 3Dwhole garden design projects, providing customized services.
100+ national sales projects, complete the construction of large-scale theme parks and urban playgrounds.
30+ after-sales team to provide timely and efficient service.
QiangLI Company Undertakes The Overall Park Planning Of Amusement Parks All Over The World
Q: Are you trading company or manufacturer
-We are the amusement park rides manufacturer with our own factory.Welcome to visit us at any time.
Q: Can you help us design the park?
- Yes,we can.We own the professional design team could design the park for you for FREE.
Q:How can you make the payment?
-1.Online credit insurance 2.Alibaba.com Pay 3.TT 4.Credit Card 5.Letter of Credit 6.Western Union 7.Alipay/Wechat
Q: How long is the delivery time?
- Instock rides will be delivery within 5 days, normal production time is 20-30 days.
Q: Can you provide personalized and customized product?
- Yes, they can be customized according to your requirements. OEM/ODM are warmly welcomed.
Новинки товаров от производителей по оптовым ценам