Product Description
Product Description
Main Structure
Steel frame we adopt hot-dip galvanizing C section or steel tube truss beam to reduce self-weight of design load and dosage of the steel. At the same time, hot-dip galvanized can widely improve anti-corrosion of the steel. The construction cycle of the steel structure work is short, which reduces the cost of the project effectively. The steel structure has strong shock resistance and can improve the comprehensive anti-seismic property of the whole house.
Secondary Frame
Roof purlin and wall purlin uses the galvanized C section steel. All components adopt bolted connection.
Cladding system
In order to satisfy the protecting material for 20 years, the outside roof is 0.5 mm aluminum zinc color steel plate.
1.To prevent dewing phenomenon, 50 mm aluminum foil glass wool is laid at the bottom of the roof plate (can be customized according to the climatic conditions).
2.To prevent sagging of the fiber wool, the wire mesh is added, which effectively improve the utilization rate of the glass wool insulation and moisture proof. To add ceiling panels below steel trusses and the ceiling panels laid horizontally is composite color plate, which not only improves the overall stability of steel trusses, but also plays a very good thermal insulation effect.
3.The inside and outside walls laid horizontally is hot-dip galvanized color steel plate, which are all used self-tapping screw to connect into a whole, effectively increasing the lateral stability of steel columns. The indoor humidity is relatively large, so a layer of plastic film is added in order to prevent moisture from entering the fiber glass wool.
Steel structure warehouse |
1.Primary Framing |
H column and beam |
2.Secondary Framing |
Z and C sections purlin |
3. Roof and Wall panels |
steel sheet and insulated sandwich panels |
4. Steel Decking Floor |
Decking board |
5.Structural subsystem |
Canopies, Fascias, Partitions, etc. |
6.Mezzanines, Platforms |
H beam |
7.Other Building
Accessories
|
Sliding Doors, Roll Up Doors, Windows, Louvers, etc |
![1.jpg]()
![.png]()
Productive design
![]()
Productive process
FAQ
Q: Are you trading company or manufacturer ?
A: We have our own steel structure, steel sheet and sandwich panel manufacturing factories. Welcome to our company to see our products and discuss your project.
Q: Can you provide on-site installation service?
A: We can provide Installation guide service based on customers’ request. The shop drawing, installation drawing and video will send to client to help the site erection. If need, our engineer will come to site to guide the installation.
Q. What is the delivery time?
A: It depends on the quantities of order. Generally, the delivery time will be within 25 to 60 days.
Q. How can I get a quotation for my project?
A: Pls no hesitate to send me message here or Email me. I will reply to you ASAP. Welcome to contact me for your building!