Гипсовый порошок линия прокаливания Альфа гипсовый машина для гипсовой Штукатурки

Сохранить в закладки 1601278730213:


Цена:13 985 609,00 ₽*

Количество:

  • В избранное

Описание и отзывы

Характеристики





Equipment Introduction










Equipment Details




Product Name
FGD gypsum powder production line
Annual capacity
15,000 to 400,000 tons
Working time
24h/day , 300day/year
Raw Material Gypsum Type
Chemical gypsum
Gypsum powder Mesh
Within 220 meshes
Heating method
Hot air boiling furnace 
Application of the powder
Building material like to produce gypsum board ,
To make plaster of paris , to make gypsum cornice or ceiling
Degree of automation
Fully automatic
Final product specification
Gypsum powder
Fuel for the heating system
Natural gas,coal,diesel,heavy oil,light oil etc
Finished powder bending strength
2.7 Mpa
Finished powder compressive strength
5 Mpa


Process Flow


1st step: Feeding&convey
The forklift put the raw material into the hopper ,and then from the hopper to the belt conveyor ,then from this belt conveyor to here ,also here another belt conveyor .this conveyor is sued to put the raw material into next step.


2nd step: Pre-Drying
From the belt conveyor come into the hammer dryer ,(later i will show you the pictures)as you see for the chemical gypsum ,the two point is very important ,the surface water and the crystal water .so in the hammer dryer is used to take the surface water out , in the hammer dryer the temperature is very high around 400-500 degree ,and why have this step ? some factory don't have this step ,this step can make the gypsum liquidity .and then to the next step to the boiling furnace ,it can easy to calcinate ,so we have this step .


3rd step: Bad dust collector

The bag dust collector, the main function is recycle gypsum powder to reduce cost.


4th: Calcination
The powder come into the boiling furnace (calcination ) to remove crystal water and remaining surface water.

For our boiling furnace, the special is , all the parts inside ,we divide to 4 chamber. The first chamber we will provide very high temperature ,and this very high temperature is used to dry the left surface water and crystal water.


The second ,third ,fourth chamber use lower temperature to provide heat to remove there main crystal water. We use this method to keep the quality of the gypsum. So both part are very important and the gypsum quality depend on this two parts :Hammer dryer and boiling furnace. This part is called the calcining system.

About the heat source: the coal-fired boiler or the natural gas burner provides heat. A part of the heat is supplied to the hammer dryer to remove the surface water, and part of the heat enters the boiling furnace to remove the remaining surface water and crystal water. At the same time, the remaining heat of the boiling furnace is recovered to the hammer Dryer . (the temperature of cooked powder is controlled at 80-100 degrees).So the heat usage is very high , more energy save ,other factory can not reach this temperature .



5th: Ball mill

This part is ball mill, because the chemical powder has quality problem, through modification mill, it can change the characteristic of chemical gypsum powder, make it similar to natural gypsum.

6th: Storage

After milling, the gypsum powder will come into the silo by elevator. For this part, if you want to produce plaster of Paris, there will be some connection parts to plaster plant.


Introduction OF Advantages



Unique Advantage Of Yurui

General engineer has over 40 years of experience, and other main engineers all have over 10 years of experience in this field.

We have the professional installation team who are professionals in this field

With over 100 projects in domestic and abroad markets, we can ensure you a successful project.

We can arrange experienced engineers for 1-2 years to help customers to operate the plant

100% success rate of domestic and foreign projects Abroad project visiting and,video visiting available.

Over 15 years of experience in oversea market project service experience


Project Cases



Case 1:
Project name:Natural gypsum powder&board project
Project capacity:
Gypsum powder line: 150000 ton
Gypsum board line : 10 Million sqm/year
Project technology:hot air technology
For this project, our Chief engineer has only taken 5 days to run the whole gypsum powder production line and put it into
production after installation, and our customer also felt surprised on it. While some manufacturers need more than one month to finish it or even some are unable to run it for production.



Case 3:
Chemical gypsum powder&POP project

This is our chemical gypsum powder project in South Africa. The customer is a well-known local building material supplier. The
owner has been in the phosphogypsum industry for more than 40 years.

project capacity:
Gypsum powder line: 50000 tons/year
Plaster of Paris line: 30000ton /year



Case 4:
project name:Chemical gypsum powder&POP project
project capacity:400,000 tons/year-500,000ton /year 3-project
technology:hot air boiling furnace technology

This project is one of our domestic projects with a large capacity of 400,000 tons. The raw material is chemical gypsum powder,
and use the production process of hot air boiling furnace. This customer's factory is only 1 hour away from our company, and now
he is currently building a second production line and its annual production capacity can be 500,000 tons.
Actually we have succeeded more than 40 similar projects in our country.


Why Choose US




How our service differ ?
1-Rich experience :
1) Experience in gypsum technology research since 1998
2) Experience of 100+ projects manufacture &install abroad and domestic
2-Professional team
1) Experts provide professional design for the project
2) Market dept. members provide professional and efficient communication
3) Experienced installation group gets projects into production quickly.
4) the Whole group provide a powerful One-stop sourcing service
3-Full range of services
1) Pre-sales: full cooperation with pre-preparation work
2) In-sales: on-time reporting of production progress
3) After-Sales: Lifetime & 24h technical support
4-Irreplaceable advantages
1) Case projects visiting abroad on-site & online
2) Training to workers & engineer


Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам