KS40 гидравлический сваебойный привод для шпунта

Сохранить в закладки 1601293765614:


Цена:2 941 265,60-3 054 391,20 ₽*

Количество:

  • В избранное

Описание и отзывы

Характеристики













Technical Data
KS30
KS40
KS50
KS60
KS70
KS85
Eccentric moment (kg.m)
3.0
4.0
5.1
6.3
7.3
8.5
Frequency /n(rpm)
2500
2500
2500
2500
2500
2500
Centrifugal force (kN)
206
275
350
433
502
584
Total weight (ton)
1.8
2.63
2.76
3.21
3.24
3.5
Oil flow (Lpm)
80
110
165
221
256
303
Amplitude (mm)
3.3
5
6
6
7
8
Arm stroke/ S(mm)
250
250
250
250
250
250
Side gripping force (ton)
50
50
50
60
60
60
Clamping force (ton)
25
29
29
45
45
45
Dimensions (L*W*H) mm
1030*1485*2042
1350*1050*2410
1350*1050*2410
1600*1280*2610
1600*1280*2610
1600*1280*2610
Excavator class (ton)
13-18
20-23
24-27
28-33
34-40
41-52
Sheet piles (mm)
400-800
350-800
400-1000
H-beams (mm)
H100-H400
H200-H500
H250-H500
Timber piles (mm)
Φ220-325
Φ120-400
Φ160-600
Tube piles (mm)
Φ90-350
Φ120-400
Φ160-600


Product superiority:
Excavator mounted, to realize the side clamp of the steel sheet pile and meet the requirements of the construction of bridges, factories and other places with limited height or super long piles. Almost all of the clamping and holding devices of the traditional hydraulic pile hammer are in the bottom of the equipment, so it only can pull and sink piles downwards. In case of long pile body during the construction, it needs the large-tonnage excavator and changes the length of the boom and the jib.
Our company has developed a new type of side clamp piling structure, the purpose of which is to overcome the clamp shortcomings of the existing technology, realize the side clamp pile, and meet the requirements of the construction of bridges, factories and other places with limited height or super long piles.








Products Configuration


Clamp in one piece casting
Clamp in one piece casting
Gear


FAG bearings
Imported Sealing Parts
SUN valve




Located in Yancheng City of Jiangsu Province, Jiangsu Kunlong Machinery Technology Co., Ltd. covers an area of 30 Mu (20,000 square meters), and the construction area is 11,000 square meters. As a high-tech enterprise with research and development center of new-type vibrating hammer, the company has passed the ISO9000 quality system certification (certificate number: NOA1824367). Based on our strong R & D center, we are professional in the construction machinery for 20 years, and we implement deep research to the whole excavator working system, optimize the design and proceed finite element analysis, dynamic simulation and welding procedure analysis with professional design software. Finally, we maximize the reasonableness of the whole system design and form the features of low weight, high excitation force, low noise, low wear and long service life to our equipment.
The high frequency hydraulic vibration hammer and side grip pile hammer produced by us are specially used together with the excavator. It utilizes the hydraulic power of the excavator and gives full play to the features of the strong mobility and flexible operation of the excavator. Based on this, the pile foundation construction has entered a new stage which significantly saves the construction costs and improves the work efficiency. Our pile hammer makes it possible that your excavator will achieve a multi-purpose equipment and improve investment efficiency. Our products have obtained several invention patents and utility model patents.
Based on domestic market, our products spread over 30 provinces, cities and antonomous regions, specially in Jiangsu, Zhejiang provinces, and the northeast of China. We actively develop the foreign market and now our products cover the market in Africa and southeast Asia.






















Q:How can I get the price?
A:We usually quote within 24 hours after we get your inquiry (Except weekend and holidays)If you are very urgent to get the price,please email us or contact us in other ways so that we can offer you a quote.

Q:Can I buy samples placing orders?
A:Yes.Please feel free to contact us.

Q:What is your lead time?
A:It depends on the order quantity and the season you place the order.Usually we can ship within 7-15 days for small quantity,and about 30 days for large quantity.

Q:What is your payment term?
A:T/T,Western Union,L/C,and Paypal.This is negotiable.

Q:What is the shipping method?
A:It could be shipped by sea,by air or by express (EMS,UPS,DHL,TNT,FEDEX and ect)Please confirm with us before placing orders.




Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам