Mobile Drill Rig Company Dth Hammer for Bore in Rock Land Crawler Perforadora De Pozos Agua
12 000,00-14 000,00 $
Сохранить в закладки 1601297413585:
GXY-360 Core Drill Rig Machine | GXY-2Q/260 | GXY-2C/360 | |||
Sneaks in the depth | 300-600m | ||||
Drill diameter | Drill rod diameter | 42/50mm | |||
Kelly | Drilling angle | 360° | |||
Drilling machine overall dimension | 2160X950X180 | ||||
Vertical axis speed | Drilling machine weight(Not including engine) | 1280kg | |||
Reverse gear speed | Vertical shaft fixed Canada pressure | 54KN | |||
Vertical axis itinerary | Vertical shaft inside diameter | 68mm | |||
Vertical shaft torque | Vertical shaft maximum torque | 2760N/M | |||
Y180L-22-4,1470RPM,22KW | 55KN | ||||
Vertical shaft pressure | Clockwise low speed | 70:121:190:263 | |||
Roll up heavy | Clockwise low speed | 70:121:190:263 | |||
Roll up the speed | High speed | 329:570:899:124 | |||
Roll up capacity | Reverse low speed | 55 rpm | |||
Move the schedule | High speed | 257 rpm | |||
Oil pump model | Vertical shaft traveling schedule | 600MM | |||
Oil pump speed | Vertical shaft fixed pulls out the strength | 72KN | |||
Biggest hoisting capacity(low speed Shan Sheng | 30KN | ||||
Drum speed | 37:65:103:141 | ||||
Steel cable winding speed | 0.41:0.73:1.15:1.58 | ||||
Steel cable winding speed | 16mm | ||||
Steel cable specification | 50m | ||||
Migration cylinder stroke | 465mm | ||||
Drilling machine leaves the manhole distance | 315mm |
Новинки товаров от производителей по оптовым ценам