Aluminum formwork is a kind of building formwork that is made by extruding aluminum alloy through special equipment.
It consists of four major systems: formwork panel, reinforcement system, support system and auxiliary system.
It has the characteristics of light weight, high strength, stability and safety, quick assembly and disassembly, and repeated use.
It can also be assembled into overall models of different sizes and shapes.
Item | Specification |
Alloy and Temper | 6061-T6 |
Elasticity modulus(Ea) | 70000N/mm2 |
Yield strength(Fa) | 240N/mm2 |
Tensile strength(Fva) | 260N/mm2 |
Material Type | Complete extrusion |
Formwork system | Flat tie system/Tie-rod system |
Main welding type | Argon arc welding |
Thickness of Panel | 4mm |
Thickness of Frame | 8mm |
Height of Frame | 65mm |
Standard Wall Panel Width | 50mm to 600mm |
Standard Wall Panel Height | 2400mm to 2700mm |
Average weight of Aluminium Panel | 25kg/sq.m |
Standard Prop | Adjustable Steel Prop |
CIEZN Aluminum Formwork Benifits
![]() | ![]() | ![]() |
Reusable | Lightweight | Fully recyclable |
CIEZN Formwork can be used 300 - 500 times so ROI is maximised with multiple projects. | Average weight is only 25 kg/m2 so no heavy lifting or cranes are required. | Aluminium formwork is 100% recyclable at the end of its usability. |
![]() | ![]() | ![]() |
Reduce site rubbish | Simple to use | Fast build cycles |
Constant reuse keeps the construction clean, safe and tidy | Can be assembled with non skilled labour with simple training and no special tools required. | Typical cycle time of 1 floor every 4-5 days or 1 single storey house a day are achieved with CIEZN Formwork solutions. |
![]() | ![]() | ![]() |
Finish quality | Design flexibility | Strength & Stability |
Achieves a high quality finish after formwork removal with only minimum “skim” coat required and no heavy plastering. | CIEZN design team are highly experienced in designing formwork solutions for multiple types of building and applications. | High load bearing capacity of up to 60 KN per M2 when assembled. |
CIEZN Aluminum Formwork Production Process
Eco-friendly---The first single industrial park in China to achieve a large cycle of aluminum formwork industry.
CIEZN Aluminium Formwork Application Cases
Aluminium formwork application space is constantly increasing: such as small high-rise, medium and low-rise, basements, public buildings, complex structures, road auxiliary structures, pipe gallery projects, etc.
![]() | ![]() |
Project Name: Changsha Fuxing World Financial Center Project Site: Changsha, Hunan Province, China Construction Year: 2021 Project Type: Super high-rise building Main Product: CIEZN Aluminium Formwork | |
![]() | ![]() |
Project Name: Changsha CSCEC Meixi Lake Center Project Site: Changsha city, Hunan Province, China Construction Year: 2011 Project Type: Standard floor buildings Main Product: CIEZN Aluminium Formwork | |
![]() | |
Project Name: Loudi Country Garden Louxing Mansion Project Site: Loudi city, Hunan Province, China Construction Year: 2022 Project Type: Super High-rise Building Main Product: CIEZN Aluminium Formwork | |
![]() | |
Project Name: Changsha Vanke Golden Dream dwelling Project Site: Changsha city, Hunan Province, China Construction Year: 2021 Project Type: Low-rise buildings Main Product: CIEZN Aluminium Formwork |
M
The CIEZN technical team could help our customer's construction team to install the first 2-3 floor of their project.
CIEZN Group was founded in 1998, with two industrial parks, one is located in Yueyang,Hunan , and the other is located in Yiyang,Hunan. For more than two decades, it has been following the development concept of green innovation, focusing on the R&D, application innovation, advanced manufacturing and installation of prefabricated building aluminum formwork, CIEZN has grown into a well-known high-tech enterprise in China.
After 27 years development, CIEZN has got each of the certifications requested in the productions. Like: ISO9001-2015 certification, ISO45001:2018 certification, etc.
Yes, there are nearly 70% standard panels can be common reused.
-Q-:What's your packing methods?
Wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.
-Q-:What's your payment terms?
T/T 30% in advance & T/T 70% before shipping to port, L/ C 100%, or negotiate according to the order status
-Q-:Are you manufacturer or trader?
A: CIEZN is the manufacturer of aluminum formwork system for more than 10 years.
-Q-:If I don't have construction crew knew well about your forwmork system, what can I do?
Well, we will send one field specialists to your construction site for guidance if you require.
-Q-: Do you have pre-mocking up service?
Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently,
then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.
-Q-: How to proceed an order for aluminum formwork?
1- Please provide completed project drawings to us.
2- CIEZN design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.
3- Construction details confirmed, sign sales contract, receiving deposit.
4- To work out shell drawings and modulation drawings.
5- Have meeting for confirming model details.
6- Production.
7- Acceptance and check.
8- Shipping.