Short description of composite antique tile installation: 1. Linearization and budgeting of materials:
Positioning line: thecenter line of the ridge as a reference line to the two sides of the sloping roof line, determine and pop up each side of the slope line of the gable end of the reference line (the bottom of the sloping line), each side of the slope with the upper and lower two straight lines can be based on the two straight lines for the line of the smooth water strip, hanging tile line positioning line. Requirements for the positioning of the line: horizontal parallel, vertical vertical.
2. install the water strip:
Along the water strip ink line every 20cm spacing size with impact hammer holes in the eye with a wooden wedge anchor, impact drill drill anchor with 80mm specifications, the depth of the eye shall not be less than 50mm. water strip with 8cm nails along the water ink line fixed, water strip must be overlapped in the water ink line in the center line, nails need to be nailed firmly.
3. Leveling and hanging tile strip installation:
Installation of tile hanging bar must be adjusted level, that is, to ensure that the entire tile hanging bar in a horizontal plane, only in this way to ensure that the tile is installed in a horizontal plane, adjusting the level of a variety of methods, the installation of workers according to their own experience and commonly used methods to ensure that the level of the tile hanging bar can be.
4. Installation of roof tile: (refer to the installation schematic)
Installation of the basic points: the main eaves tile installation must be arranged vertically from the
bottom to the top of a single sheet (the bottom from the eaves tile), from left to right horizontal advancement, the first
installation of the main eaves tile of the sloped roof after the installation of the ridge tile program.