Wholesale Cheap Cantilever Form Traveler for Bridge Construction Traveller

Сохранить в закладки 1601347855215:


Цена:999,00-1 200,00 $*

Количество:

  • В избранное

Описание и отзывы

Характеристики



Main Products




Product Description




Cantilever form traveler
Cantilever form traveler underslung form traveler is designed according to the characteristics of the single-column cable tower shape, and its structure is relatively compact. It mainly consists of main beam, hanging points, bottom basket and formwork. Scope of application: Suitable for bridge construction with single-column , especially suitable for scenarios that require rapid construction and reduced material use.Cantilever form traveler efers to the main beam of the bridge adopts a single box section to support and pour concrete. It is widely used in the construction of medium-span bridges, especially suitable for the suspension casting construction of continuous beams, T-frames, continuous rigid frames and cable-stayed bridges.




Specification


After-sale Service
Online technical support, Onsite Training
Tolerance
Traffic Construction
Formwork design
Jinchen Zhihui supply
Design Style
Traditional
Project Solution Capability
3D model design, total solution for projects
Place of Origin
Tianjin,China
Type
steel formwork
Brand Name
Jinchen Zhihui
Size
Non-standard, custom-made
Product name
Steel Concrete Column Formwork
Name
Bridge Beam Formwork
Color
Customer Requirements
Thickness
according to design
Packing
Standard Sea-transport Packing
Type
Recyclable


Company Profile




Material Shop




Eouipment Workshop










Packing & Delivery




FAQ




Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW,CIP,DDU,Express Delivery;
Accepted Payment Currency:USD,EUR,CNY;
Accepted Payment Type: T/T,L/C,Credit Card;
Language Spoken:English,Chinese

Q3:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q4:How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

Q5:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
C:We provide remote or on-site instruction to the builders.

Q6:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q7:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q8:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q9:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.




Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам