2019 литровая пресс форма Taizhou для литья под давлением 1 литр

Сохранить в закладки 60269536697:


Цена:*

Количество:

  • В избранное

Описание и отзывы

Характеристики


Company Information

 

Taizhou Huangyan Chenhang Mould Factory, established in the year of 2004, is a professional company engaged in mould design, manufacturing & producing. We are specialized in plastic mould, injection mould, commodity mould, kitchenware mould, auto and motorcycle parts mould, SMC moulds,etc. We had introduced High Speed CNC CentreSlow-feeding NC wire cut machine, Deep hole drilling machine,EDM, Wire cutting machine, Grinding 

machine, Latheing machine etc, all these advanced equipments ensure good quality moulds with short delivery.

exhibitions

 

FACTORY-2.jpg

Product Description

 

Product Name

2015  Taizhou 1 litre injection bucket mold 

Product material

PP

Core& Cavity Steel

P20

Steel hardness:

HRC30-33

Mould Base

45#

Cavity Number

ONE

Injection System

Big gate, hot runner

Ejector System

oil hydraulic and ejector pins

Cycle Time

65 second/shot

Tooling lead time

60 days

Mould life

500, 000 times

 

 

Our Advantage

1. We are moulds manufacturers

2. Competitive price

3. High mould quality with guaranteed

4. On time delivery

5. Strict quality control

6. All the mould produced follow on customers’ requirements

 

Offer you

Professional & detailed response

In time complete quotation

Professional and integrity designs & drawings

Mold flow analysis report

Once a week mould process machining

In-time mould test and sample delivery

 

 

5G pail .jpgbucket mould1.jpgbucket mould-1.jpgbucket mould.jpg

 

Our Services

 

Chenhang Mould Quality Control

1.Mould Material Q/C

 

1) mould steel checking (hardness,flaw detection)

2) mould spare parts checking (hardness,size)

 

2.Mould Making Process Q/C

 

1) design checking ( part design,mould desig,mould enginering drawing)

2) mould size checking (according to drawing)

3) mould testing (check mould working,sample)

 mold flow.jpgworking process.jpg

Packaging & Shipping

 

Packaging Detail

The moulds covered with anticorrosive oil inside and plastic film outside.

Final packed in wooden case.Or we can follow you to make your own special package

Delivery Detail

55 days ( 40 days mold finished then free 3 times to test mold )

mould package.jpg 

FAQ

 

Chenhang Mould Operating Steps

 

1.Unscrew the bolt to take down the Connection Block.

2.The cooling channel connected by Diffluent Block.

 

 

 

Contact Us

 

Our location on map

 map.jpg

 

The time cost from other city 

1.From Ningbo by train take around 1 hour. 

2.From Yiwu by bus take around 3 hours.

3.From Shanghai by train take around 4 hours.

4.From Guangzhou by airplane take around 2 hours.

 

Please feel free to contact with us if you have any inquiry for Plastic Injection mould . Thank you !

 

contacts-name.jpg


Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам