Высокое качество Лучшие безопасности Кольцо фарфоровых изоляторов для сельскохозяйственной электрической изгороди стрижки овец

Сохранить в закладки 60297558755:


Цена:*

Количество:

  • В избранное

Описание и отзывы

Характеристики


product description






















































Product  name



wood post extended angle ring insulator for electric fence



Material



Plastic



Size



46*43*27.5cm



weight



10KG/carton



MQQ



200pcs



Price Term



FOB



Lead time for sample/stock



3-5days



Lead time for max production



25-35days



Package



25pcs/bag,500pcs/ctn



Payment way



T/T,Western union,Paypal



Shipping way



By sea,or by express as DHL,FEDEX



Remark



Eco-friendly and environmental



14937_2.jpgimages (2).jpg






















Screw in



Available



Apply for



Wood post



Available wires



Polywire



Color



Orange,purple,white,black etc.



 1030549.jpgcorral-electric-fencing-ring-insulator-compact-yellow-x-25-pack_4152563.jpgimages.jpg (1).jpg


 


 


How to Install Electric Fence Insulators


1.Install line post insulators. Use spray paint to mark the locations on your wood and steel line posts where you want to locate the insulators and wire. Wire heights vary depending upon the type of animal you plan to contain, but a permanent, interspecies (sheep and cattle) electric fence requires seven or eight wires at distances of 5 to 10 inches


2.Install line post insulators on your steel T-posts. Clasp the snap on the back of the insulator around the circumference of the pole at the correct height. Firmly push the clasp against the pole until it clicks into place. Repeat this process for all the insulators on each steel T-post.


3.Install line post insulators on your wooden posts. Position the plastic insulator at the correct height on the post,insert a nail into the nail hole on the top of the insulator and hammer it completely into the post. (Nails typically come with the insulators.) Insert another nail into the nail hole on the bottom of the insulator and hammer it in. Repeat this process for each insulator on each wooden post.The better way for these is to use the screw-in insulators,it is much better for installing,no need to drill holes.


4.Install terminal insulators on your corner posts and gate posts. Cut a section of wire that is long enough to wrap 3-1/2 times around your first corner post. Thread the wire through the hole in the center of the terminal insulator then wrap it around the corner post at the desired height, leaving approximately six inches of space between the terminal insulator and the post; when you install the electric fence, this allows the terminal insulator to move slightly with the wire fence in either direction, which reduces the pressure on the corner posts). Rethread the wire and wrap it around the corner post two more times, then wrap the two ends back over the wire to secure it. Repeat this process for each terminal insulator on each corner post.


5.Check your insulators to ensure they are all installed at the correct heights before installing the rest of your electric fence.


images (1).jpg


Production process


 


 


 



 


 


 


 

































































1. What kind of company we are ?

Founded in 2009, we're a professional factory for electronic fence, fence handle, electronic rope,light indication,electric fence voltage and Accessory for years in Wuxi city, Jiangsu, China. We were gainning good reputation among our customers for our professional,  warm and thoughtful service, Because we know that a long terms business based on the quality control, prices, packing,delivery time etc. Price, Quality, Service, Innovation. Our commitment has never changed.


 


2. Where we're located in ?

Wuxi City, Jiangsu Province, China


A.    20 minutes by car far away from Suzhou City


B.    1.5 hours by car far away from Shanghai Airport


C.    2.5 hours by car far away from Ningbo Airport


D.    3.5 hours by car far away from Hangzhou Xiaoshan Airport


E.    2 hours by plane from Guangzhou  


F.    2.5 hours by plane far away from HK



3. What's our delivery port ?

 Shanghai Port / Shanghai Airport


 


4. Which kind of service we could provide ?

OEM and ODM is availabe. As we have our own designer and own tooling workshop.


 


5. What's our quality assurance system ?

Incoming Materials -> IQC ( Incoming Quality Control ) -> Materials to be stored in warehouse -> Production Dept. take the materials -> Production Dept. makes pre-production sample -> Sales Dept. confirms the samples -> Production Dept. start mass production -> IPQC ( Input Quality Control ) -> LQC ( Line Quality Control ) -> FQC ( Finished Quality Control ) -> OQC ( Outgoing Quality Control ) -> Goods ready for shipment



 


6. What kind of package we could provide ?

Bubble bag, PVC/PET blister, Color box, PE bag with label/head card, Display box etc.


 



7. What's our lead time ?

Within 15 days after deposit based on MOQ.


 


8. What kind of shipping service we could provide ?

1) By sea through Ningbo/Shanghai Port ( LCL,FCL )                                                            


2) By air through Shanghai Airport                                                                                              


3) By express ( TNT, DHL, FEDEX )



9. What's our payment terms ?

1. 30%  T/T as deposit, 70% to pay against copy of B/L.                                                  


2. 100%  L/C at sight 


 


10. How about our market distribution ? 

 




 


 


 


 


 


To know more products,Pls click 


 


//lydite.en.alibaba.com


Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам