Сохранить в закладки 60395630728:
Name | PE 80 / 100 SDR 17.6 DN 200 Gas Pipe Plastic End Closures |
Material | LDPE |
Size | 1/2" to 30" or according to drawings, samples and accurate size. |
Color | Yellow, Blue, white, Orange, Black, Red, Green, or other colors as per your requirements |
Thickness | OEM,ODM accepted. |
Marking | standard or as customer’s need |
working temperature | -20°C to 80 °C |
Inspection | in-house or the third party |
Application | All kinds of pipes, tubes, valves, flanges, and so on. |
MOQ | 100 pieces or as your requirement |
Productivity | 100000 pieces per day |
Package | standard woven bag,carton , or according customers requirement. |
Payment | T/T, L/C,Western Union |
Sample time | 7 days against the drawings or samples offered. |
Delivery time | 15 - 30days after sample confirmation |
Loading port | Ningbo or Shanghai, China |
Who we are?
JJGF are manufacturer and specialized production plastic protection caps for pipe ,valve ,flange or other products about 20 years in Wenzhou China.
Company & Plant:
Exhibition:
What’s products do JJGF supply?
l Plastic pipe end caps,plastic pipe end plugs,plastic valve covers,plastic flange protectors are main product .
l JJGF have enough stocks in many sizes for immediate delivery.
l Custom made plastic caps. JJGF has a sound development of mold design,processing,manufacturing systems.
How to application?
Plastic Pipe End Plugs are made from LDPE and easy to fit pipe,valve,flange etc.
a. Protecting pipeline in shipping,storage,installation from dust,animal,soil and keep pipe internal cleanning.
b.keep edge of pipe end completely.
c.Prevent paint from pipe internal when take protective measures,like spray lacquer.
Packing & Shipping:
Inventory:
Q: Are you Factory or Trading?
A: We are manufacturer and specialized in Plastic Pipe End Caps ,Plastic Flanges Protectors.
Q: How about your product?
A:We pursue high quality products,and support sample for your testing.
Q: When is the Lead time?
A:Almost products have in stock,and lead time is about 3 days after confirmation.
Mass production time is about 7 days after confirmation.
Q: What do you think the most important points for a good shopping experience?
A: Quick ,Professional ,In detail ,Responsible reply every question from customer in pre-sale service, in-sale service and after-sale service.
Contact us
Новинки товаров от производителей по оптовым ценам