Сохранить в закладки 60518932043:
Material | 1) MDF/Solid wood/Plywood/Artificial stone/Wood veneer with lacquer finish 2) Metal/Stainless steel/Hardware accessory with baking finish 3) Tempered glass/Hot bending glass/acrylic/LED light/hot bending glass/Acrylic/LED light | ||||||
Size | Customized, need to match your place. | ||||||
Logo & Color | Customized | ||||||
Service | Free design, installation instruction, take measurements, professional after-sale service. | ||||||
Payment | T/T, Western Union, Alibaba. 50% deposit, 50% balance before loading. | ||||||
Place of Origin | Guangdong, China (Mainland) |
Features high-quality fire board: 1. Pattern clear and thorough, lifelike, three-dimensional sense. 2. no color. 3. Surface smooth, wear-resistant.
Features Excellent base plate: 1. MDF formaldehyde content is not exceeded. 2. See section wood panels there is no gap. 3. Smooth surface, density is good. In particular it should be noted that the door to see whether the deformation time of purchase.
Environmental level: E1.
Fire Level: B1
Wires for different countries different authentication name.
Australia: SAA; America: UL; Canada: CSA; Europe: CE
Raw material certification
Environmental level: E1
Fire Level: B1
Wires for different countries different authentication name.
Australia: SAA; America: UL; Canada: CSA Europe: CE
Step 1 | Clear the product | ||||
Step 2 | EPE Foam inner packed , all around the product. | ||||
Step 3 | Bubble foam each side protected | ||||
Step 4 | 10mm MDF with 18mm plywood frame cartons | ||||
Step 5 | Stick the marks on wooden carton | ||||
Step 6 | Loading container, All the goods are delivered by sea |
1) Consign for shipment
2) Booking space
3) Order shipment insurance
4) Customs Declaration & Commodity
5) Loading
6) Transportation
7) Unloading destination port
8) Cargo Delivery Notice
9) Custom clearance
10) Take delivery of goods
All steps are designed for safe protection and long distance transportation.
The time schedule of one order | ||||||
Design progress | 7-10 days | |||||
Building time | 15-20 days | |||||
Shipping time to port | 10-30 days, please contact us to check the shipping time | |||||
Delivery time from port to mall | 3-7 days including the customs clearance work |
Step 1. Contact myshine staff, send your requirements to myshine, then get agreement each other;
Step 2. Designer work with sales and buyer to finish the final design and drawing;
Step 3. Buyer pay deposit and then Myshine start building;
Step 4. Quality inspection for product;
Step 5. Buyer pay balance + myshine loading product ,installation instruction provided as well.
Step 6. Installation at site (shop fitting)
Новинки товаров от производителей по оптовым ценам