Сохранить в закладки 60724858392:
Solar system 6000W electric generator solar / 6KW complete set solar panel system kit for villa
| 6KW On-Grid System Component List | ||||
| Norminal Power of PV Generator (W) | 6000Watt | |||
| Nominal AC Voltage | 220V-240V | |||
| Nominal AC Frequency | 50Hz/60Hz | |||
| Item | Model No. | Quantity | ||
| 1 | Solar PV Modules | 265W Poly Crystalline | 24 | |
| 2 | Grid Tied Solar Inverter | Think Power T6000TL | 1 | |
| 3 | Mounting Brackets | Tile roof | JX-1001 | 1 |
| 4 | DC Isolator | Water Proof IP67 | DC600V | 2 |
| 5 | AC Breaker | Water Proof IP65 | Air Breaker 440V | 1 |
| 6 | Ground Earth Cable | 6 S.q.mm | 50 | |
| 7 | PV Ground Earth Clamp | Copper with screws | 50 | |
| 8 | DC PV Connection Cables | 4/6 S.q.mm | 50 | |
| 9 | MC4 Connectors | MC4 | 10 | |
| Note: All the above components are for reference. | ||||
On Grid system is connecting to the national grid net directly. No battery backup.
On Grid system can only use at the country where allowed people connecting to the utility grid net.

Advantages
A) On grid solar system will reduce the power bill as it is possible to sell surplus electricity produced to the local electricity supplier.
B). On grid solar system are comparatively easier to install as they do not require a battery system.
C). On grid solar system has the advantage of effective utilization of generated power because there are no storage losses involved.
D). On grid solar system is carbon negative over its lifespan, as any energy produced over and above that to build the panel initially offsets the need for burning fossil fuels. Even though the sun doesn't always shine, any installation gives a reasonably predictable average reduction in carbon Consumption.





One stop solution of solar system | |
| Early Research | 1. Project location; |
| 2. Installation area; | |
| 3. The ability to send power; | |
| 4. Capital and rough size. | |
| Project Proposal | 5. Project background and necessity; |
| 6. Situation at home and abroad; | |
| 7. System configuration; | |
| 8. Method of being connected to grid; | |
| 9. Installation commissioning solution; | |
| 10. Budgetary estimates; | |
| 11. Measurement of capacity; | |
| 12. Financial analysis | |
| Engineering Design | 13. Solar module selection; |
| 14. The selection of electrical equipment; | |
| 15. Monitoring and communication system design; | |
| 16. Design of capital construction; | |
| 17. Design of power grid access system. | |
| Engineering Construction | 18. Organizing and arranging construction; |
| 19. Equipment installation and commissioning; | |
| 20. System commissioning and acceptance inspection | |
Новинки товаров от производителей по оптовым ценам