Сохранить в закладки 60805801247:
Grid-tied, on-grid, utility-interactive, grid intertie and grid backfeeding are all terms used to describe the same concept – a solar system that is connected to the utility power grid.
Item | Model | Description | Quantity | |||
1 | Poly 340W solar panel BSM340P-72 | Size:1956x992x40mm Weight:25KG | 18PCS | |||
2 | On grid inverter 5000W | Output Voltage: 220/240V Pure shine wave | 1PC | |||
3 | Monitoring system | Wi-Fi Module | 1PC | |||
4 | Mounting Structure | On roof or on ground | 1SET | |||
5 | PV Cables | 4mm2 pv cables | 200M | |||
6 | pv connector | Rated Voltage:1000V | 10PAIRS | |||
> 25 years Warranty
> Highest conversion efficiency of 17%
> Anti-reflective and anti-soiling surface power
loss from dirt and dust
> Excellent mechanical load resistance
> PID Resistant,High salt and ammonia resistance
> 5 years standard warranty
> Max.Efficiency 99.6%,European efficiency 99%;
> Integrated DC switch for added safety protection;
> Power factor continuously adjustable
>Transformer-less design and high power density,
off lighter and more convenient installation
> Flexible communication connection,support RF WIFI
> Residential Roof(Pitched Roof)
> Commercial Roof(Flat roof&workshop roof)
> Ground Solar Mounting system
> Vertical wall solar mounting system
> All aluminum structure solar mounting system
> Car parking solar mounting system
> PV Cable 4mm2 6mm2
> AC Cable
> DC Switches
> AC Breaker
> AC/DC Combine box
1. Save more money with net metering
Your solar panels will often generate more electricity than what you are capable of consuming. With net metering, homeowners can put this excess electricity onto the utility grid instead of storing it themselves with batteries.
2. The utility grid is a virtual battery
The electric power grid is in many ways also a battery, without the need for maintenance or replacements, and with much better efficiency rates. In other words, more electricity goes to waste with conventional battery systems.
By Sea | Delivery from Shanghai or Ningbo seaport | ||||
By Air | Departure from Shanghai Pudong Airport | ||||
By Express | By TNT/DHL | ||||
Payment Term | T/T | EXW | 30% T/T in advance, paid the balance before shipment | ||
FOB | |||||
CNF | 30% T/T in advance, paid the balance against copy of B/L | ||||
CIF | |||||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | ||||
West Union | Amount lower than 5000usd | ||||
Delivery Time | 7~10days after receiving payment for one container | ||||
100% product quality protection
100% on-time shipment protection
100% payment protection for your covered amount
250KW on grid solar project in Malta,EU
60KW on grid solar project in Guatemala,South America
1.2MW solar power plant in Ecuador,South America
144KW on grid solar project in California,USA
150KW on grid solar project in Japan
Новинки товаров от производителей по оптовым ценам











