Сохранить в закладки 62215466454:
YATAI 1/4 inch two high resistance textile braids EN854 3TE/SAE 100R3
Medium pressure hydraulic applications, hoisting, hydraulic transmissi
Mineral and biological oils, ASTM 1, ASTM 3, polyglycol based oils, water, water oil emulsions.
HOSE MARKING:YATAI HYDRAULIC HOSE SAE 100 R3 1/4″ EN854 3TE DN6 W.P.145BAR 2100PSI
YATAI PART.REF. | HOSE SIZE I.D | R.O.D | O.D | MAX W.P | MIN B.P | MIN B.R | W.T | ||||
DN | dash | inch | mm | mm | bar | psi | bar | psi | mm | Kg/m | |
TB R3 5 | 5 | -3 | 3/16" | - | 13.5 | 105 | 1520 | 420 | 6090 | 75 | 0.16 |
TB R3 6 | 6 | -4 | 1/4" | - | 14.5 | 87 | 1260 | 350 | 5075 | 75 | 0.18 |
TB R3 8 | 8 | -5 | 5/16" | - | 16.8 | 84 | 1220 | 335 | 4860 | 100 | 0.27 |
TB R3 10 | 10 | -6 | 3/8" | - | 18.2 | 110 | 1590 | 440 | 6380 | 70 | 0.23 |
TB R3 12 | 12 | -8 | 1/2" | - | 21.5 | 93 | 1340 | 372 | 5390 | 85 | 0.29 |
TB R3 16 | 16 | -10 | 5/8" | - | 25.6 | 80 | 1160 | 320 | 4640 | 105 | 0.39 |
TB R3 19 | 19 | -12 | 3/4" | - | 28.8 | 70 | 1010 | 280 | 4060 | 130 | 0.45 |
TB R3 25 | 25 | -16 | 1" | - | 35.4 | 55 | 790 | 220 | 3190 | 150 | 0.57 |
TB R3 31 | 31 | -20 | 1,1/4" | - | 42.5 | 45 | 650 | 180 | 2610 | 190 | 0.73 |
TB R3 38 | 38 | -24 | 1,1/2" | - | 49.4 | 40 | 580 | 160 | 2320 | 240 | 0.93 |
TB R3 51 | 51 | -32 | 2" | - | 62.2 | 33 | 470 | 132 | 1910 | 300 | 1.30 |
CONTINUOUS SERVICE TEMPERATURE RANGE: -40°F / +212°; F-40°C / +100°C
MAX OPERATING TEMPERATURE: 212°F 100°C FOR OIL,149°F 65°C FOR AIR, WATER AND WATER BASED FLUIDS
REINFORCEMENT: TWO HIGH RESISTANCE TEXTILE BRAIDS
COVER: ENVIRONMENT RESISTANT SYNTHETIC RUBBER
APPLICABLE SPECS: EN 854 R3 - SAE 100 R3 - ISO 4079-1 R3
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white wearable woven bags. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 20 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Новинки товаров от производителей по оптовым ценам