Сохранить в закладки 62552172189:
200L closed type steel drums
Inner diameter: 571.5mm+-3mm
Outside diameter: 585mm+-3mm
Height: 885mm+-3mm
Wallthickness: 0.9mm to 1.4mm
We do the bottom structure analysis before we push a new order production, We will do the broken test,
To make sure the bottom structure well and that is 7 layers edge
A)Raw Materials Control
To ensure quality of the drums ,we do the Raw Materials Control first
B)Process Control
Set up quality control points on certain key processes of forming the final product to supervise process quality and product quality for ensuring a consistent and stable quality of the products.
1). Check the model first
Make sure the model in the good condition before the production.
2).Analyze the structure of the first drum for each order
Analyze whether the weld is smooth, check the bottom structure , make sure the number of roll edges reach 7 layers and all of those in the good condition,only can max production after make sure the first drums in the good quality condition
3)Monitor production at any time,make the quality control record
4)Pressure test with air press machine
Ensure that the weld seam , the body and the bottom of the conical drums are well-fitted without leakage
C) Quality inspection
1) Apperance and physical indexes
Make sure the apperance and physical indexes all in the good condition
2) Performance testing
Make sure the leakage test, fall test , stacking test, and presure test are all in the good condition
3) Package quality control
Moniter again about the drums quality .Make sure the wrapping film is firm when packing the tray.
4)Check the package condition before loading
5)Follow the loading instuction when loading the container.
Standard exporting package, with PP cloth or bare package
Loading details:
80pcs/20gp
160pcs/40GP
238pcs/40HQ
Inspection by third party
TT ,LC
Some feedback from the customers
Новинки товаров от производителей по оптовым ценам