Башенный очиститель химических отходов поставщик промышленных газа Очистительная башенка скруббер H2S влажной кислоты

Сохранить в закладки 62573405493:


Цена:5 000,00 $*

Количество:

  • В избранное

Описание и отзывы

Характеристики


Products Description
Brand
SINO GREAT
Usage
Waste gas purification
Product name
Absorption Tower
Rated processing speed
20m3/h
Motor Power
22kw
Material
FRP
Weight
1ton
Inlet size
Customizable
OEM
Yes
Product Size
11mx1.4m
Working Principle
The exhaust gas first enters the falling film recoverer through the exhaust pipe to cool the falling film to absorb the produced acid. The diluted acid liquid recovered by the falling film recoverer enters the liquid storage tank through the drain pipe for recovery. The dilute acid liquid recovered by the primary absorption tower enters the liquid storage tank of the tower, and the tail gas that has not been absorbed enters the secondary absorption tower. The dilute acid liquid recovered by the secondary absorption tower enters the liquid storage tank of the tower and is not absorbed. A small amount of exhaust gas enters the vacuum pump, and the liquid recovered by the vacuum pump enters the body liquid storage tank, and the exhaust gas after reaching the standard after being absorbed by the vacuum pump is discharged through the exhaust pipe. In the acid preparation process, the generated low-concentration dilute acid solution participates in the acid circulation reaction, and the dilute acid solution made in the subsequent process is used to supplement the reduced circulation liquid in the previous process. After the concentration reaches the process requirements, Centralized storage. This process completes the process of acid tail gas recovery. This series of equipment can adopt automatic control to realize unmanned management mode.
Our Advantages
Company Profile
Case List
No.
Case
Date 
1
SOGP plant in Philippines for 10,000MTPA
In 2016 Year
2
EPC projects of SOP in Egypt for 60,000MTPA&100,000MTPA
In 2015 Year
3
Overhaul the furnace in Indonesia
In 2011 Year
4
The project of SOP for 40,000MTPA
In 2010 Year
5
Main equipment suppiler of SOP in India for 20,000MTPA
In 2008 Year
6
Overhaul the furnace in Indonesia
In 2007 Year
7
The contractor of SOP in Phlilippines for 10,000MTPA
In 2006 Year
8
The EPC project of SOP in Indonesia for 10,000MTPA
In 2004 Year
Qualifications & Honors

Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам