Customized Fully Automatic Light Steel Metal Stud and Track Roll Forming Machine

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description







Product Overview


No.
Item
Parameter
1
Coil material
0.3-1.2 mm steel(according to customer's request)
2
Rollers material
Gcr15 bearing steel, quenching (HRC55-58)
3
Shaft material
45#forge steel, thermal fining
4
Cutting blade
Cr12Mov, heat treatment(HRC58-62°)
5
Driving method
by chain
6
Working speed
15-25m/min
7
Dimension
about 10*1.0*1.5 m (length*width*height)
8
Weight/ Container
about 4.5T/ one 20'GP


Working process
Decoiler--guiding--roll forming--hydraulic cutting--out table


No.
Component
Quantity
1
Decoiler
1 set
2
Guiding
1 set
3
Roll forming
1 set
4
Hydraulic cutting
1 set
5
Out table
2 sets
6
Hydraulic station
1 set
7
PLC controller
1 set
8
Spare part&tools
1 box


Product Description




Price shouldn't be the only factor you consider




Products Exhibition




Customer Visits and Exhibition




Packing&Delivery


Standard sea shipping method
Mostly nude packing. PLC controller will be covered with film and all units are to be fastened by steel wire.




FAQ


1.Does one machine can only produce one size?
Not exactly, it depends on the machine.

2.Do you have after sales support?
Yes,we are happy to give advice and also have skilled technicians available to maintain the machine if needed.

3. You are trade company or factory?
We are Manufacturer.

4.How long the machine could be made?
Normally speaking, high precision roll forming machine could be made out with 40 working days.If you need machines in hurry, we
can make it for you less than a month.

5. Do you provide customized?
Sure, we can design the equipment according to the data of the structural section you provide.Our engineers can offer the best
professional solution to our worldwide clients.Meanwhile we can provide door-to-door service.

6.How to visit your factory?
By high speed train from Shanghai to Wuxi, half an hour.

7.What's the warranty period?
12 months warranty period, starting from the date of the successful installation and commissioning of the equipments at the
Buyer’s Installation site.

8.May we visit your factory?
Sure,Warmly welcome to our factory at any time.


0.0346 s.