ESE IF3-100 building MACH60 lightning arrester for sale

Share on:


Price:RUB 7,676.86 - RUB 21,495.21
Price in USD:Details

Quantity:


Product Overview

Description

 ESE IF3-100 building MACH60 lightning arrester for sale

 

Product Description

 

                                                                                                                                           more products, please click it ↓

 

IF3 Pre-discharge building Lightning Arrester/Lightning Rod 

     Stainless steel rod series, its unique design, the leader discharge, impedance fault current, air gap discharge technology,and can generate early pilot channel, improve the lightning effect, reducing the discharge voltage, discharge lightning current change. The lightning waveform broadening, wave head gently, amplitude is reduced, thereby expanding the scope of protection. Avoid "swipe" and "lightning" phenomenon, and effectively inhibit the ground potential counterattack harms, is the ideal equipment for preventing thunder.

if 3  1

Features

 

Lightning rod is made of stainless steel,  Because of the  stainless steel  has high conductivity and corrosion resistance, can be used for a long time without maintenance.

 

1.The fastest 86 mu s first discharge time 

2.Low ground lightning more accurately, reduce the probability of lightning rod, lightning strike point fall on the body.

3.Under the same installation height, times larger than the common lightning protection radius.

4.Pure physical structural lightning rod, internal no electronics, no aging, maintenance free. Low IF3 

5.early discharge lightning rod installation is simple: light weight, don't need to be equipped with shield coaxial cable. 

6.Beautiful shape, selects the stainless steel material, can be installed in harsh place. 

IF3

Technical Parameter

 

 

                       Lightning protection radius

Building height

2

3

4

5

6

8

10

20

40

first kind of lightning protection building

32

48

65

79

79

79

79

80

77

second kind of lightning protection building

40

59

78

97

97

98

99

102

105

third kind of lightning protection building

44

65

86

107

107

108

109

113

118

 

 Certification

certification

 

 

 

Application

 

1.Complex: industrial, commercial and civil construction, science and technology museum, exhibition center, resorts

 

2.Historic buildings, museums, scenic spot and historic city, statues

 

3.Information industry: center machine room, GSM, CDMA base stations, PHS, tower Petroleum and petrochemical, oil pipeline, the reservoir, gas station, transfer station 

 

4.Transportation: Bridges, ports;Highway communication, monitoring, charging center

 

5.Hydraulic power: communications center, hydrological stations, substations, power plants, the dispatching center

 

6.Civil aviation: airport terminal, tower, radar, navigation, oil tank area, communication machine room

 

7.Financial insurance, banking and insurance of large and medium-sized computer center, the securities company

 

8.Radio and television tower, station, launch machine room 

 

application

 Project

 

Packaging & Shipping

Packing

IMG_4622

IMG_4620

Shipping

transport

Our Services

satisfied yes

FAQ

 

1. Why should we can be your partner?

  our own factory:favorable prices

  Technician:give you the most professional solution.

  Certifications: ISO9001:2008 and ENISO12100:2010,ensure the superior in quality.

 

2. Is the sample free or not?

   It depends on which product do you want? For example, if it is stainless steel pipe, we can supply the free sample. However, as for lightning rod, because the cost of the lightning rod is very high, we are afraid that we can not provide the free sample.

 

3. If the order is too large , can you ensure in time delivery?

Sure! Our factory with high productive force and we have the advanced technology devices which make us ensure in time delivery.

 

4. How to deal with the problems after purchase?

   If it is the problem of installation, our technical personnel will be in the fastest time to reply you, and guide you how to install the operation.

   If it is the problem of quality, please show me your evidence, we will make corresponding solution on specific issues, such as replacement or refund.

If you have any questions, please feel free to contact us.

 

 

0.0117 s.