NEWCROWN Fully Automatic Custom Mineral Drinking Water Bottling Line

Share on (1600837933684):


Price:$8,500.00

Quantity:


Product Overview

Description

























De-Capper
It is used to down load the caps of gallon water barrels.





Outside-Brusher
5 gallon barrel outside-brusher can be applied for washing new and recycled barrels.





Washing Filling Capping
The machine is integrated washing, filling and capping together. It is ideal machine to produce barrel water.




Technology Parameter
Model
QCF
16-12-6
QCF
18-18-6
QCF
24-24-8
QCF
32-32-10
QCF
40-40-12
QCF
50-50-15
QCF
60-60-15
Heads of Washing, Filling, Capping
16/12/6
16/12/6
24/24/8
32/32/10
40/40/12
50/50/15
60/60/15
Production Capacity
(B/H)
2000-4000
5000-7000
8000-10000
10000-13000
13000-15000
15000-20000
20000-24000
Applicable Filling Content
φ=50-110mm H=170-310mm (Volume: 200-2000ml)





6
Main Motor Power
(KW)
4
4.2
5.2
6.2
7.5
8.2
9.5
Overall Dimension
(L x W x H)
2230×1630×2250
2600×1965×2250
2900×2200×2250
3880×2200×2250
3700×3000×2350
4500×3500×2350
4500×3500×2350
Weight (KG)
2500
3500
4200
6000
7000
7600
9800








New Crown Machinery, located in Zhangjiagang City, China, plans, develops and manufactures machines and complete lines for the fields of process, filling and packaging technology. Its product portfolio is rounded off by information technology and factory planning. As an international technology group, the Company focuses on world-leading process technology and components for sophisticated production processes.












1.When can arrange the delivery after customers place the order ?
A: Normally production time is around 60-90 days,the exactly depend on what kind of machine you ordered .
2.How long time for installation?
A: According to your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3.What kind payment be accepted by New Crown?
A: We can accept L/C,Western Union,T/T.
4.How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pays air tickets go and back,accommodation,food,and so on.
5.Installation and maintenance:
A:The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from New Crown,or we can sent our engineers to help you.




0.1791 s.