Asphalt Pavement 10m3 Road Micro Surfacing Slurry Sealer

Share on (1601076293008):


Price:$180,000.00

Quantity:


Product Overview

Description


Slurry Sealer Micro-Surfacing Paver For Road Maintenance



Product Description


 


 


Slurry Sealer (Micro-Surfacing Paver) is a new generation product developed in accordance with market demand and customer feedback, on the basis of engineering and construction experience. It can be used in process of lower seal coat, micro-surfacing, fiber micro-surfacing construction, mainly to treat the pavement diseases of friction resistance reduction, cracks and rut, etc., and enhance skid resistance and water repellency of pavement, to improve the road surface evenness and riding comfort.slurry-sealer-002.jpgslurry-sealer-001.jpg


Production Capacity:


Paving Width: 2500-4300mm


Paving Thickness: 3-15mm


Output: 3t/min


Liquid volume: 4000L / 4000L





TECHNICAL PARAMETER


 


 




























































MODEL/MODELOSSXF1035
SSXF1135
ChassisHOWO6*4HOWO/SHACMAN 8*4
Engine Power73KW/2400rpm
75KW/2200rpm
Aggregates Bin Volume10m³12m³
Emulsion Tank Volume3.5m³4m³
Water Tank Volume3.5m³4m³
Additive Tank Volume400L600L
Stuffing Box Volume2x0.5m32×0.5m³
Discharging Volume of MixerMaximum 3.5T/min
Maximum 3.5T/min
Width of Paver 2.5-4.3m2.5-4.3m
Overall Dimensions10500×2500×3500(mm)(L×W×H)11670* 2520*3570(mm)(L×W×H)





Company Information




Our Services


service-2022.png 





FAQ


Q:Which countries your equipment have been exported?


 


A:Thailand, Philippines, Indonesia, Myanmar, Russia, Bangladesh, Kazakhstan, Uzbekistan, Russia, Romania, Somalia, Kenya, Malawi, Nigeria, Togo, Mozambique, Oman, South Africa, America, Peru, Chile, Colombia, Venezuela, Australia, etc. 


 


Q:How many workers are needed to operate one set of asphalt plant?


 


A:1 loader operator, 1 mechanical, 1 electrician, 1 supervisor ,1 the operator of the whole plant.


 


Q:How many days are used for installation of one set asphalt plant?


 


A:Around 20-30 days, according to local situation.


 


Q:Do you provide overseas erection and training service?


 


A:Yes, we can send experienced engineers to your country, guide erection and commissioning and train your workers how to operate the plant.


 


Q:How long is the delivery time?


 


A:30-40 days, according to different configuration. We promise to delivery on time.


 


Q:Can you sent me some spare parts freely?


 


A:Some spare parts will be sent to you together with asphalt plants freely.


 


Q:How to go to your asphalt plant factory easily?


 


A:Our city has airport. If by air, you can fly from Guangzhou/Beijing/Shanghai no more than 2 hours. Also you can fly to Zhengzhou, we send car to pick you up there.


 


Q:Can I visit your factory?


 


A:Of course. We warmly welcome you to visit our factory. And we provide you great services like airport pick up, hotel booking, etc.


 


Q:How long is the warranty of your asphalt plant?


 


A:12 months


 


Q:What payment terms you accept?


 


A:We accept T/T, L/C,D/A,D/P, Western Union, MoneyGram and other ways  according to the practical situation.


contact us


Get the quotation of asphalt mixing plant, welcome contact us  at any time.


Pls following us for more information of asphalt plant and related equipment.




0.1427 s.