Garden road materials cold mix color asphalt with 1.2cm thickness

Share on (60205693150):


Price:

Quantity:


Product Overview

Description


Garden road materials cold mix color asphalt with 1.2cm thickness

 

Product Description.png

 

Go Green Cold Mix Colored asphalt is a new patented high technology product, uses eco-friendly cold mix processing and significant ultra thin overlay technology, the material can be storaged and shelf life unopen up to six months. Its suitable for landscaping paving, sport and leisure, public parks and gardens, bus lane, bicycle path as well as light traffic driveway paving. The paving thickness is only 1.0-1.5cm, which greatly reduce the material cost. 

 

Different color avaiable

 

20140214163411_6226.png20140214163423_1692.png

 

Outstanding Features


Go Green Micro-Paving Cold Mix Color Asphalt has some basic performances such as soft, easy to compact, water stability, long shelf time, excellent strength, construction at normal temperature, they are generally described as follows:

 

A. Cold mix technology. Paving thickness only 1.0-1.5cm.

B. Noise reduction, Anti-slip and Fog-proof.

C. Stick to the original pavement surface closely

D. Storage up to 6 month

E. Excellent resistance to water damage.

F. Environmental Protection

G. Construction time no limitation.

Different color available, lively colors protection 

 

Application Area

QQ20151202111258_.png

 

Package are available in 20kg bag and 1 ton bag

 

How to Use.png

Step one:

 

Preparation

 

1.   The product construction temperate should be above 0°C, recommend to construct above 5 °C

 

2.   Clean the Debris of the road. The surface should be free of ice, standing water, snow, and loose material.

 

Step two:

 

Paving 1.0-1.5cm thickness by standard asphalt paver.

  

Step Three:

 

Compact the surface as soon as possible, after  1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.

 

Step Four:  

 

Close traffic completely after construction. till pavement surface is dry and hard, depends on the weather, usually open to traffic after 6-12 hours. 

QQ20151202114023.png

 

Our Company.png

 

^2794C7954CAC14D2353EA517F03A4E5FAC8386A6533058EDD9^pimgpsh_fullsize_distr.jpg

 

Certification

 

-01.jpg
^5FB8C6F47C06228B88A0B4EAD5C7AA255962C4E42FA699F116^pimgpsh_fullsize_distr.jpg

 

Our Market

 

-1.jpg

Our Service

 

^A209B1E77A7B21EDE31344118C406843FD13510853C2304B1C^pimgpsh_fullsize_distr.jpg

 

 

Welcome to contact us, we will reply to any of your question at the earliest time.


0.2013 s.