underlayment sbs bitumen waterproofingitumen rolls for Roofing (60313859437)

Share on:


Price:RUB 113.73 - RUB 454.91
Price in USD:Details

Quantity:


Product Overview

Description

SBS product details

   underlayment sbs bitumen waterproofing\bitumen rolls  for Roofing     

Specification:

Width:1m

Length/roll:7.5m/10m/15m  or as your need.

Surface:PE film/Granules/Sand...

W9_5E8$A1LG78F)IYRGL)2

Characteristic:

a) SBS modified bitumen waterproof membrane is specially used as waterproof material in cold area

b) APP is specially suitable for areas of high temperature and of strong sun-shine

SBS/APP Modified Bitumen Waterproof Membrane

c)Good performance in Good impermeability ,anti-puncture, anti-broker, anti-resistance, anti-erosion, anti-mildew, anti-weathering

d)Possess good tensile strength, elongation rate and size stability which could be well suited the substrate distortion and crack

WJ}ME88OM}RFVXL]LF`)X(R

Applicable scope:

Suitable for civil building roofing, underground, bridge, parking, pool, tunnel in the line of waterproofing and dampproof, especially for the building under high temperature. According the roofing engineering stipulation, APP modified bitumen membrane could be used in the Grade I civil building and industrial building which has special waterproofing requirement

There are two methods in application:
a) One way is by heating and melting method.Heat the polyethylene film of the membrane and roof deck surface by heating and melting method to be nearly melted (not flowing),then install the membrane filly bonded to the roof deck with overlaps of 5-10cm.
b) The other way is by cold adhesive method.Pour the cold adhesive homogeneously on the roof deck, then roll the membrane to install it to be fully sticked to roof deck.
By heating and melting method and by cold adhesive can be used in alternation in application as requested.                                             

c)After application,a full serious inspection is required to sure no air bubble,no falling away.etc. to guarantee the waterproof life.

Requirements for construction:

1.The base should be dry and clean. Do not work in the rainy or snowy day.

2.Do not work under heavy wind(above 5 grade)

3.Unsuitable for construction below 5°C

4.If it is rain or snow in the process of construction, protective measure to the laid membrane is must.

5.All the workers should put on special uniforms to keep safe when installing. There should be equipments for fire controls.

Construction: 

The special formulation of fire enables the membrane to be applied directly with primer. This application is named as "Torched on application".  

1.Base processing: the base surface musts be clean,solid,level,dry;no grit,rift and loosing dust. For a large recess, fill it with cement mortar and then level it. Remove the protrusion and clean dust If working on base slab or lateral face,water lowering should be done.

2.Painting primer before laying the membrane, clean the dust on the surface of concrete base with dust catcher or dust-blower; then paint entirely with treatment agent of DY primer for waterproofing(for purpose of dust consolidation and high adhesive effect).

3.Heat to melt: place membrane correctly, fire torch, heat the membrane with base entirely, when the surface of the membrane is black and bright with a fusion layer, apply the membrane and press it into a solid and flat state.Before the membrane is cool, seal the edge of joint by float.

4.Requirements for lapping: There should be less than 3 layers of lapping, with the joint seams appearing as"T" type,avoid 4 layers of lapping.The width of longitudinal lapping is between 50 and 80mm,and of end-lap joint 100mm

5.Use a roller to push hard the membrane surface to ensure it stick firmly.

Apply-SBS-010

Package and transportation:

1. Membranes should be stored under dry and ventilated conditions.

2. Different types of membranes must be piled separately.

SBS005

Bitumen waterproof membrane5 

 

ccompany information

1-WhyChooseUsext-1-500

Why choose us?

 

1,Honest supplier to the worldwide buyers

 

2,Factory, direct supplier, competitive price

 

3,Know how to control the costing with 10 years producing experience

 

4,Warm and friendly service and guide

 

5,3 shifts workers for 24hrs production, high capacity

 

6,Small and big orders are welcome from the worldwide

 

7, 24 hours service for you 

 

Website: www.clwaterproof.com

Weifang Choice-Link Trading Company is the import and export department of our waterproof materials manufacturer. We have 4 waterproof materials factories since 1997 in China. The company produces SBS/APP modified bitumen waterproofing membranes, Self adhesive bitumen waterproofing membranes, Self adhesive bitumen flashing tape, Self adhesive butyl waterproofing tape, PVC/TPO/HDPE/EVA waterproofing membranes,Polymer compound waterproofing membrane, Liquid bitumen coating,etc, our company also export Non woven polyester mat for bitumen membranes, Glassfiber mesh compound mat for bitumen membranes, Glassfiber mesh, Modified bitumen membrane production lines,etc

Our products are sold in over 20 countries all over the world. Approximately 70% of the total produced materials are supplied to the China market while the remaining 30% are exported to European countries, Middle East, South East Asia, South American and U.S.A.

 

 

 Honest is our business policy, quality and service first. The key of the successful activity in the high quality of research and controls before, during and after production.

 

 
zhaoli1.jpg

 

 

 

60313859437
0.0073 s.