Partition drywall metal stud and track

Share on (60440343838):


Price:RUB 21.56 - RUB 58.72

Quantity:


Product Overview

Description

Product Description

Partition drywall metal stud and track


The stud is made of galvanized steel sheet with good rust-proof function.

It is widely used for partition walls in various construction.




Features
1.Galvanized Zinc coating
2.Flexibility of application
3.Size adjustability & custom
4. Longer life span & higher strength
5.Easy and fast for installation
Products Show
Item
Thickness(mm)
Height(mm)
Width(mm)
Length(mm)
Note: The size can be change according to your request.

        
    Metal Stud
0.6  
45,50
50
Customized
0.4-0.6
30,45,50
75
Customized
0.5-0.7
40,45,50
100
Customized


   Metal Track
0.6
35,50
50
Customized
0.3-0.6
25,35
75
Customized
0.6-0.7
35
100
Customized

        Main Channel(DU)
0.5 , 1.0
10,12
38
Customized
0.5-1.2
10,15
50
Customized
1.0 , 1.2
25,27
60
Customized
     Furring Channel(DC)
0.5-1.2
10,15
50
Customized
1.0-1.2
25,27
60
Customized
      Edge Channel(DL)
0.45
30*28,30*20
20
Customized

    Main Tee
0.3
24
38
Customized
0.26
24
32
Customized

Cross tee
0.3
26
24
Customized
0.26
24
32
Customized

    Wall Angle
0.35
22
22
Customized
0.4
24
24
Customized
     
      Omega
0.4
35*22
68
Customized
0.4
16
35
Customized
Partition series

                    Metal Track

          Metal Stud and Track


                   Wall Angle


Related Products

               Light Steel Keel


        Furring and Main Channel


                     T Grid

About us

Factory

Workshop

Warehouse


Team

Our Certifications

Company Profile


Our factory is Jiangsu Oucheng Construction Materials Co.Ltd, located in Jiangyin Huashan Industrial Park, is an enterprise specializing in manufacturing light steel keels. The company began its investment in 2007. Upon the completion of 8000 square meters standardized workshop. Oucheng Construction Materials Co.Ltd introduced from Itlay and Germany the machinery for light steel keels and furniture production equipment and technology to achieve the automated production lines , which came into smooth operation in May 2008.
Packing & Delivery
Product Installation


                           Please send an enquiry as below guide, we are glad to give you the best price.

                                           
                                                                                #
0.1961 s.