SMC/GRP/FRP water tank dimensions

Share on (60460212622):


Price:$150.00 - $230.00

Quantity:


Product Overview

Description


  SMC/GRP/FRP water tank dimensions

Brief of frp grp smc water tank 

The FRP water tank panel is made from food-grade resin, via high temperature and powerful mechanical pressing.

(1)In manufacturing process, it adopts to manufacture method that mechanical pressing so it increase the anti-seismic and shock resistance strength;

(2) In the shape design, there is sag arc in the middle of water tank plate, it improve the bearing ability of water tank. In addition, it has the 45° and 90° flange so it don’t need the corner fittings.

(3) The size of the FRP water tank panel: 1000*1000mm; 1000*500mm, 500*500mm,

     Thickness of the FRP water tank  panel:5mm,8mm,10mm,12mm,14mm,

     16mm,18mm and 20mm.

(4) The water tank can be assembled to be any size with the different size FRP panels from

      1-1500CBM.

 

Features 

(1)Strong resistance to corrosion

(2)Reasonable structure design

(3)All welded on-site combination. High strength, good sealing,   prevent  secondary  pollution of water quality

(4)Light weight, that is one half of ordinary steel plate water tank

(5)Easy to install

(6)Clean, bright, beautiful appearance

Application

1)storage and regulation of living water supply & construction water supply

2)Rainwater Harvesting & Storage

3)Effluent/Acid and alkali solution treatment & Storage

4)Hospital,buildings,building site, school and other place

5)temporary water storage for expansion of the heating system, condensate tank and construction, geological survey, industry, National defense project etc

Water tank function 

Project

Requirements

Leakage

No leakage after filled with water

Deformation 

after full of water 

Filled with water,

wall maximum deformation after no more than 1.0

of the tank Bottom Center height,

no more than 10 mm maximum deformation

Water quality

Accord with GB5749

Panel physical and chemical function 

Project

Performance index

Tensile strength,Mpa 

≥60

Bending strength,Mpa

≥100

Bending modulus,Gpa

≥7.0

Pap hardness 

≥60

Bibulous rate,%

≥60

Glass fiber content,% 

≥25

Structure drawing

 6.jpg

QQ20151222160104.png

Asseccories

66789890.jpg

Specification parameter

Tank

height (mm)

Thickness of each panel

bottom

panel 

1st layer 

side panel 

2st layer 

side panel 

3st layer 

side panel 

4st layer 

side panel 

cover 

panel 

100010#10#///5#
150010#10#8#//
200012#10#8#//
250012#12#10#8#/
300014#14#12#8#/
350016#14#12#10#8#
400018#18#14#12#10#

Tank insulation

There are many insulation materials commonly used polyurethane, rubber and plastic, etc.The polyurethane heat preservation effect is the best, also is my company's innovative product, has been in different has been widely used in different occasions, the market reaction is good

The tank polyurethane heat preservation make full use of the polyurethane itself good effect of heat preservation and bonding properties, high pressure foaming , and various forms of water tank is perfect joint, outsourcing angles, beautiful and durable.

Besides, there are more economical and general rubber insulation for you to choose, it is a suitable choice in not very high requirement heat preservation.

Innovative in heat preservation of exterior used the glue plate, color steel plate, stainless steel plate, aluminum plate, galvanized steel, compared with the traditional aluminum foil, use this protective material insulation board for longer service life, better, more beautiful 

appearance. 

1.jpg

Tank installation

Step 1. Install steel footings on leveled concrete foundations.
Step 2. Align GRP panels to be pre-assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels.
Step 4. Connect panels with bolts and nuts.
Step 5. Position bottom panel sections, and finish up base of tank.
Step 6. Position three sides of the tank. 
Step 7.Position and fix roof panels and if required, roof support pipes and plates
Step 8. Install reinforcement if required.
Step 9. Close up the tank with the fourth side.
Step 10. Finish the internal or external reinforcement.
Step 11. Fill and test.

11

Packing and shipping 

 

Company information

.jpg

Dezhou Huili Environmental Technology Co., Ltd 

is a professional production enterprise specializing in the production and design of the water tank 

Company's products include: fiber glass reinforced plastic water tank, stainless steel watertank,enamel steel water tank, hot dip galvanized steel water tank, gush-paint steel water tank and undergroud water tank Company tenets: quality first, customer first and best credibility!The same price with best quality,the same quality with highest reputation!

The company has a professional after-sale service institution, each service branch are provided with a fixed installation and after sale serviece personnel to ensure the user to get a response from us in the first time.

Our certificate

certificate

FAQ 

1.What's the guarantee, in case the water tank breaks down?

The water tank has one year s guarantee. If it breaks down, generally speaking, our technician will figure out what the problem may be, according to client s feedback. 

Parts will be replaced for free if the problems are caused by quality fault.

2.How about the documents after shipment?

After shipment, we ll send all original documents to you by DHL, including Packing List, Commercial Invoice, B/L, and other certificates as required by clients.

3.How long is the delivery time?

For standard water tank less than 100m3, it would be 7-10 days; For non-standard water tank and customized water tank according to client s specific requirements, it would be 15 to 30 days.

4.How's the payment?

Telegraphic Transfer(T/T).

5.Do You Arrange Shipment For The Machines? 

Yes, dear esteemed customers, for FOB or CIF price, we will arrange shipment for you. For EXW price, clients need to arrange shipment by themselves or their agents.

6.How is the packing?

Solid Seaworthy plywood Box Package with Steel Belt

Save space as much as possible for container loading

Our market

QQ20151210101944.png

Contact to us 

link


0.1915 s.